Will Durgachak-Haldia section be doubled and more loop lines be added in Tamluk-Digha section? Only then speedup in these two sections will also be possible, especially in later long one. Tamralipta and DGHA-MCA EMU forces ASN-DGHA EXP to patiently wait for 30 mins at Deshparan PH.