At present, Portals shall be erected towards 1A side and TTU/TTC shall be installed to cover PF1 loo-line and PF2 main line . Rest of the masts/portals shall be erected only after yard remodelling in doubling to be executed in April/May this year , to avoid mass mast cutting during doubling.