ive seen that most trains are getting late in ndls jhs section{about 40 min} and jhs bpl section{about 40 more min}
ksk,apsk,tnsk,tirrukural,swarna jayanti,punjjab mail,apac etc never reaches bhopal on time
they mostly coverup theri time between ngp-bpq-wl section.
this has been my obeservation from last 6 months that these trains are taking 5hrs 40min between bpl ngp strech, and 2hrs 30min in ngp-bpq strech...
more... to cover up delay time.
i feel every trunk route{ndls mumbai,ndls mas,mum hwh,hwh mas,mas mumbai should have done tripling long time ago,but they never invested on infrastructure until now
ndls hwh given the traffic it has should have atleast 4 tracks end to end with cnb mugalsarai having 6 tracks
we always dream about 200kmph semi bullet,but trains cant attain those speeds on such saturated tracks