Current update on the ongoing doubling work at SSPH, after the last updates /blog/post/1606708 and /blog/post/1330465 . Great news, the 2nd line has been laid fully with all required electrification work. Now it is connected from both the sides, KSBP and MSDL. The new PF has been ready (almost ~ 95%).
.
All the pics were taken by my father today morning, when he went for a morning walk. He sent me those pics via whatsapp. Enjoy.
....
more...
All the 5 pics here show the newly built staircase, which will connect both the PFs with the road. In Pic 5, the complete status of the 2nd line (on the right side) is clearly visible.