Since it got WAP-4 from NDLS to SPJ,then why it is necessary to stop. This for 20min at LKO and 10min at CNB AND 15min at GKP Just make all these stoppage for 5min or make these three stations technical halt in place of commercial stop and reduce it travelling time by approx 30min
Haul this train byLHB coaches and increase its speed from 110mps to 130mps between NDLS and GKP .Although it is an most punchual and prior train of ECR