MEGA BLOCK ON SONDAY 6.4.2014
Central Railway
Central Railway will operate Mega Block on its suburban sections for carrying out maintenance work on Sunday 06.04.2014: -
THANE-KALYAN DN SLOW LINE FROM 11.00 AM TO 3.30 PM
All...
more... DN Slow/Semi-fast services leaving Mulund from 10.39 am to 3.22 pm will be diverted on DN fast line between Mulund and Kalyan stations halting at Thane and Dombivali stations during the block
period.
DN locals will not available at Kalva, Mumbra, Diva, Kopar & Thakurli stations. Passengers of these stations are permitted to travel via Kalyan/Dombivli/Thane stations during the block period.
All DN fast locals leaving Chhatrapati Shivaji Terminus Mumbai from 10.08 am to 2.40 pm will halt at Ghatkopar, Vikhroli, Bhandup and Mulund stations in addition to their respective halts and will
arrive destination 15 minutes behind schedule.
All UP fast line Locals leaving Thane from 10.50 am to 3.36 pm will halt at Mulund, Bhandup, Vikhroli, Ghatkopar and Kurla stations in addition to their respective halts and will arrive destination
15 minutes behind schedule.
All slow locals arriving/leaving Chhatrapati Shivaji Terminus Mumbai from 10.00 am to 4.00 pm will and arrive destination 15 Minutes behind schedule.