Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Tue May 7 13:24:52 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Filters:

Page#    127 Blog Entries  <<prev  next>>
General Travel
85144 views
19

★★★
Jan 13 2020 (17:56)   SL/Surathkal (2 PFs)
KT_Railfan^~
KT_Railfan^~   2018 blog posts
Entry# 4539170            Tags   Past Edits
#Konkan Railway Electrification
Trial Run of Eloco between Thokur - Bijoor.
ED WAP4 22549

Source : KRU Twitter.
Translate to English
Translate to Hindi

19456 views
0

Jan 13 2020 (18:03)
promethsuresh^~
promethsuresh^~   3547 blog posts
Re# 4539170-1              

8 Public Posts - Mon Jan 13, 2020

3 Public Posts - Tue Jan 14, 2020
Info Update
14090 views
14

★★
Jan 06 2020 (18:21)   TNGL/Toranagallu Junction (3 PFs)
guest
Entry# 4532963            Tags   Past Edits
#ELECTRIFICATIONUPDATE of TNGL-JSW loop line
The electric poles are now fitted with some socket.
Date: 6th Jan 2020
Pic: SELF
Translate to English
Translate to Hindi

2 Public Posts - Mon Jan 06, 2020
General Travel
28253 views
16

★★
Dec 25 2019 (00:45)   SBC/KSR Bengaluru City Junction (Bangalore) (10 PFs)
SWRailway^~
SWRailway^~   13377 blog posts
Entry# 4522488            Tags  
Pic 1-3 BYPL ramp connecting SA line got electrified. With this electrification of enitre 48 kms of BYPl HSRA section is completed and after HSRA till Rayakottai ohe poles are being laid and by end of 2020 upto DPJ works will be completed and according to some sources electrification works have been started from Omalur side also but no confirmation about that. Now BAW UBL and YNK KQZ are the last remaining important routes which must be electrified.
Pic 4,5,6 and 7 Shots in YNK DMM section which was recently upgraded to 115 kmph mps. Some curves was made more inclined and sleepers were replaced with heavier ones along with that 60 kg rails were placed to fit higher speeds and main
...
more...
reason was excellent soil quality which made this section a high mps route.
Captured this by myself while travelling in 06565 SBC HUP MEMU.

Translate to English
Translate to Hindi

4 Public Posts - Wed Dec 25, 2019

21088 views
1

Dec 25 2019 (11:37)
promethsuresh^~
promethsuresh^~   3547 blog posts
Re# 4522488-6              

4 Public Posts - Wed Dec 25, 2019
Info Update
13935 views
10

Dec 16 2019 (19:39)   STP/Sitapur Junction (6 PFs)
shuk^~
shuk^~   4235 blog posts
Entry# 4515451            Tags  
#ElectrificationUpdate #16December2019
DAL/DaliGanj Junction - STP/Sitapur Junction electrification update
Poles - 100%
Brackets - 100%
Wiring - 100%
OHE
...
more...
van - Completed entire section
SSP (2 as on date) - At STP/Sitapur Junction 80% work has been completed (Completion expected by Dec2019). At SD/Sidhauli 75% work has been completed (Completion expected by Dec2019 or so).
SP (Only 1) - Basic structure completed and two transformer has been placed at BKT/Bakshi Ka Talab (Completion expected by 2020).
Block - Completed and new line has been connecetd with existing line at STP/Sitapur Junction and DAL/DaliGanj Junction as well.
OHE wire energizing - From 10-Dec-2019 wire has been energized.
Trial run : First trial run expected on 20-Dec-2019 instead of 22-Dec-2019. More information awaits.
CRS inspection - As per newspaper 26-Dec-2019
Commercial uses - Any point of time after successful CRS and permission granted by traffic department.

Translate to English
Translate to Hindi

1 Public Posts - Mon Dec 16, 2019

1 Public Posts - Sun Dec 22, 2019

3 Public Posts - Mon Dec 23, 2019

2 Public Posts - Tue Dec 24, 2019

2 Public Posts - Thu Jan 02, 2020

2 Public Posts - Sun Jan 12, 2020

1 Public Posts - Mon Jan 13, 2020
Info Update
6160 views
7

Dec 09 2019 (16:20)   STP/Sitapur Junction (6 PFs)
shuk^~
shuk^~   4235 blog posts
Entry# 4509164            Tags   Past Edits
#ElectrificationUpdate #09December2019
DAL/DaliGanj Junction - STP/Sitapur Junction electrification update
Poles - 100%
Brackets - 100%
Wiring - 99%
OHE
...
more...
van - Currently finalising at STP/Sitapur Junction
SSP - 2 SSP's been located at SD and STP. At STP 80% work has been completed (Completion expected by end by 20-Dec-2019). At SD 60% work has been completed (Completion expected by end by Dec2019 or so).
SP - Basic structure completed and two transformer has been placed at BKT (Completion expected by 2020).
Block - On 08-Dec-2019 at STP 6 hours block been taken and new line coming from DAL side has been connected with existing live wire of BUW-STP line. In today's (09-Dec-2019) block wiring at station line has been connected with existing live wire towards ROZA. Tomorrow block will start at 13:30 to finalised any pending work.
OHE wire energizing - Post block completion
Trial run : First trial run expected on 22-Dec-2019
CRS inspection - As per newspaper 26-Dec-2019
Commercial uses - Any point of time after successful CRS and permission granted by traffic department.

Translate to English
Translate to Hindi

1 Public Posts - Tue Dec 10, 2019
Page#    127 Blog Entries  <<prev  next>>

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy