Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat May 4 18:12:57 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Filters:

Page#    38 Blog Entries  <<prev  next>>
Info Update
39990 views
6

Jan 23 2023 (18:31)   TATA/Tatanagar Junction (6 PFs)
ShashankSwain99^~
ShashankSwain99^~   5642 blog posts
Entry# 5610085            Tags  
1 compliments
_/\_
#Tender for Providing architectural and technical consultancy for feasibility study, master planning, urban designing, engineering & Preparation of Detailed Project Report (DPR) for integrated Re-Development of TATANAGAR Railway Station of Chakradharpur Division

Approx. Cost : Rs. 31 Lakhs, Bid Security : Rs. 62,500/- & Completion period : 180 Days
Translate to English
Translate to Hindi

1 Public Posts - Mon Jan 23, 2023
Info Update
30655 views
3

Dec 20 2022 (14:53)   ADTP/Adityapur (3 PFs)
ShashankSwain99^~
ShashankSwain99^~   5642 blog posts
Entry# 5577433            Tags  
2 compliments
Agree Great
#Tender

Conducting Final Location Survey, Traffic survey, submission of comprehensive DPR for all civil, electrical and S&T work, preparation of detail estimate along with Alignment Plan, Yard Plan, drawing for minor bridges, major bridges, ROB/RUB, FOB, level crossing drawings, Hydrological & Geotechnical Investigation and all other ancillary works for (A) Flyover at A-cabin of Bondamunda (Item No. 31) (5.0 Km); (B) Flyover Padphar /Dongoaposi down grid to Dongoaposi 3rd line/Joint line (5.0 Km) (Item No. 28); (C) Flyover Up grid of Adityapur-Gamharia section to Birarajpur (Item No. 28) (5.0 Km); (D)
...
more...
Flyover Birarajpur to Kandra (Chandil) end (Item No. 32) (5.0 Km); (E) Bypass at Padapahar (Bolanikhadan to Banspani to Dhamra Port) (Item No. 33) (10.0 Km) under the jurisdiction of CPM/GS/CKP of S.E. Railway.
............
Approx. Cost: Rs. 53 Lakh, Bid Security: Rs. 1,06,800/- & Completion period: 03 months

Translate to English
Translate to Hindi

1 Public Posts - Tue Dec 20, 2022
Info Update
108831 views
5

Dec 13 2022 (15:08)   SLF/Silli (3 PFs)
ShashankSwain99^~
ShashankSwain99^~   5642 blog posts
Entry# 5570515            Tags  
#Tender

Conducting Final Location Survey, Traffic survey, submission of comprehensive DPR for all civil, electrical and S&T work, preparation of detail estimate along with Alignment Plan, Yard Plan, drawing for minor bridges, major bridges, ROB/RUB, FOB, level crossing drawings, Hydrological & Geotechnical Investigation and all other ancillary works for ILLOO-SILLI Bypass line avoiding MURI Jn. (5.9 km) under the jurisdiction of CPM/GSU/RNC of S. E. Railway.
.............
...
more...

Approx. Cost: Rs. 8.75 Lakh, Bid Security: Rs. 17,500/- & Completion period: 02 months

Translate to English
Translate to Hindi

1 Public Posts - Tue Dec 13, 2022
Info Update
18705 views
4

Dec 13 2022 (13:57)   TATA/Tatanagar Junction (6 PFs)
ShashankSwain99^~
ShashankSwain99^~   5642 blog posts
Entry# 5570473            Tags  
#Tender

Elimination of 01 Nos Manned Level crossings (LC No.139) by construction of RUB between Salgajhari - Tatanagar section under ADEN/I/TATA.(By Pushing Method)
.............
Approx. Cost: Rs. 10.84 Cr, Bid Security: Rs.
...
more...
6,92,000/- & Completion period: 12 months (1 Year)

Translate to English
Translate to Hindi
Info Update
15998 views
4

Dec 13 2022 (13:20)   TATA/Tatanagar Junction (6 PFs)
ShashankSwain99^~
ShashankSwain99^~   5642 blog posts
Entry# 5570439            Tags  
#Tender

Consultancy Services for Detailed Project Report and Detailed Design Consultancy in connection with Execution of Final Location Survey, Soil Investigation, Preparation Yard Plans, Slope stability analysis and Submission of various detailed Design & Drawings between (i) Nimpura Reception Yard-Kharagpur 3rd Line (4.40 Km), (ii) Hijli-Nimpura 3rd Line (5 Km), (iii) Nimpura Reception Yard-Kharagpur 4th Line (4.00 Km), (iv) KharagpurTatanagar 4th Line (134.1 Km) & (v) Kalaikunda-Nimpura West Outer-Gokulpur Connectivity Avoiding Nimpura Reception Yard (5 Km) under the jurisdiction of Dy CE/Con/Kharagpur of S. E. Railway. Estimate Nos. 14/FLS-SUR/2022, 15/FLS-SUR/2022, 16/FLS-SUR/2022,
...
more...
24/FLS-SUR/2022 and 25/FLS-SUR/2022.
................
Approx. Cost: Rs. 3.23 Cr, Bid Security: Rs. 3,11,600/- & Completion period: 06 months

Translate to English
Translate to Hindi
Page#    38 Blog Entries  <<prev  next>>

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy