this line has very low priority in the eyes of IR
you are wrong here. This section is one of the good earning stretch for IR. It has pass train load along with major freight load too. And NTPC is also on this line too at Tanda. This will not only get doubled but electrified too.
To avoid loco reversal at SHG, railway needs to construct a bypass line