The on time running SMET-SBC intercity, hauled by KJM WDG4 with SHF was made to wait in YPR outer for 30 minutes to let the workmen complete their OHE work. (You can see the work men still on the poles in the pics).
As soon as some workmen got down from the ladder which was inclined onto OHE wires, it was cleared signal to enter YPR Yard. Good to see the OHE work progress as they were now connecting wires to the poles.
Meanwhile a handful of passengers who couldn't resist the...
more... wait, gotdown and walked along the tracks to enter the Outer ring road.