Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat May 18 01:30:48 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 67260
Posted: Aug 29 2010 (23:46)

7 Responses
Last Response: Sep 09 2010 (13:24)
1614 views
0
Aug 29 2010 (23:46)  
 
guest   0 blog posts
Entry# 67260              
Can anybody tell me that have electric locos started operated on MGS - BNS and UMB - MB - BE Sections of Uttar Pradesh . The net is not providing any relevant info about these routes . Thanks .
Translate to English
Translate to Hindi

2 Posts

536 views
0

Aug 30 2010 (17:46)
Vinay Kumar   23030 blog posts
Re# 67260-3              
BSB-ALD Main line hasnt got pole erected yet & i dunno about the electrification completion!!
As far as travel timing in between ASR-MGS via MB-BE-LKO-SLN-BSB Trunk route is concerned, nothing extra-ordinary will happen, until LKO-SLN-BSB Track is 100% doubled (its some 55% Double yet)
PS: Shramjeevi is mostly in-time or before while returning from NDLS to Rajgir @ LKO.
It get late for 1-2
...
more...
hours till SLN (Total 140 km from LKO, 75 km single traction).
LKO-BSB Stretch makes train late for 2-4 hours, if they get into single track @ conjested timing!!

Translate to English
Translate to Hindi

500 views
0
Sep 05 2010 (19:02)
guest   0 blog posts
Re# 67260-4              
Mr. Vinay , any idea about the Doubling Status of BSB - ALD Route ?? I have heard that this route is via Jhangai Jn - Gyanpur Road - Allahabad City (ALN ?) . Just like trains go from MGS to ALD usually via Mirzapur (MZP ?) as it's a shorter route compared to via BSB - Kashi , similarly a shorter route should be designed between Mirzapur & Lucknow , so that "Superfast" trains like Himgiri Exp or Punjab Exp can use it like a Superfast Corridor Bypass Line . Like this time can be saved by avoiding the slow speed MGS - BNS - SLN - LKO Line . Such a Superfast Rail Corridor can be built on the lines of the Sarona Bypass which HWH - CSTM Duronto Exp uses to avoid touching Raipur Jn . This rail corridor should not have a single station & should be...
more...
a Double Track Fully Electrified Route with tracks suitable for 170 Kmph Speed Tolerance . Another such route suitable for such type of a corridor can be between Gomoh Jn and Patna Saheb . By this , trains can avoid the slow & robbery proned Jasidih - Madhupur Route . Another route can be between Dankuni & Panagarh to avoid Bardhamman (BWN) . Thanks .

Translate to English
Translate to Hindi

557 views
0

Sep 06 2010 (05:13)
Vinay Kumar   23030 blog posts
Re# 67260-5              
Can u create any corridor for Mirjapur-LKO. It would have to cross BSB-ALD & will have to merge with ALD-RBL-LKO Route somewhere (which is much longer than existing route, with low MPS)
Further, MGS-SLN-LKO Route is Trunk Route & its slow, coz its single & heavily conjested in peak times!!
@@@@@@@@@@@@@@@@@@@@@@
Recently travelled SLN-LKO-NDLS.
SLN-LKO
...
more...
(PNBE-MTJ Exp) - Passenger departed 15 mins before its arrival
Travel Time: 4 hrs.
SLN-Shivnagar - 30 Km: 1 Hour (Halted Shivnagar for 30 Minutes to give crossing to Varuna)
Shivnagar-Sindurva - 30 Km: 1.5 Hour (Halted 45 Min @ Sindurva & Passenger arrived from front & halted. ASR-KOAA overtook that passenger & crossed PNBE-MTJ Exp from front)
Sindurva-Dilkusha Outer - 70 Km: 45 Minutes (Halted Dilkusha for 30 Min, overtooked passenger in-between)
Dilkusha-Lko - 10 Km: 45 Minutes (Halted LKO Outer for 25 Min)
Result: Missed Duranto (filed TDR) & Travelled Shramjeevi (Following PNBE-MTJ Exp) with unreserved ticket, charged & receipt issued later on (3A/2A/1A was totally empty in Shramjeevi - No-one boarded @ LKO coz of late running)
PS: I have travelled SLN-LKO Stretch in 1 hr 45 min by Shramjeevi once!!

Translate to English
Translate to Hindi

688 views
0
Sep 08 2010 (22:30)
guest   0 blog posts
Re# 67260-6              
Dear Mr. Vinay , please don't get angry . Forget MZP-LKO Corridor . But aren't the other 2 superfast corridors connecting Gomoh - Patna Saheb & Dankuni - Panagarh possible ?? After all , many "Normal Superfast" & "Duronto" Trains can use these new lines to travel congestion free from Calcutta to North India (Punjab , UP , Uttrakhand and J & K) . Gussa mat kareye . Sir , agar aap aise naraz ho jayenge toh phir hamari queries known solve karega . Thank you .
Translate to English
Translate to Hindi

668 views
0

Sep 09 2010 (13:24)
Vinay Kumar   23030 blog posts
Re# 67260-7              
Thats y MGS-BSB-SLN/PBH-LKO Corridor is been developed!!
Further, CNB-Farrukhabad-Shikohabad too is Trunk Route & in future, that can provide link for CNB-BE-MB-ASR Route (Via Kasganj)!!
LDH-MB-LKO-GKP/BSB-GHY, MGS-PNBE/GAYA-HWH etc, can deconjest existing Trunk Route & Golden Corridor need not to be forget about!!
PS: Criss Cross movement can shatter train's speed greatly!!
Kindly
...
more...
compare: Sampoorna Kranti & Shramjeevi Exp!!

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy