Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat May 4 00:03:23 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 629461
Posted: Jan 02 2013 (16:22)

83 Responses
Last Response: Jun 04 2013 (15:43)
4 Followers
General Travel
29398 views
13

Jan 02 2013 (16:22)   HYB/Hyderabad Deccan Nampally (6 PFs)
 
WDP 4
WDP 4   367 blog posts
Entry# 629461            Tags  
HYB METRO UPDATE
---
Overhead uninterrupted power line for metro
---
The metro rail project will have an overhead 25 KV power line across the 72-km viaduct being constructed in the three corridors. Initially, the
...
more...
authorities thought of having the power line between the tracks as is prevalent in Europe which also provides an aesthetic look.
But after consulting experts and studying the power systems of some existing metro lines, it was decided to go in for an overhead line, said Hyderabad Metro Rail (HMR) Managing Director N.V.S. Reddy. “We will be striving to come up with a better design to compensate for the overhead traction line,” he said.
Tie-up with Transco
HMR has tied up with APTransco for uninterrupted power supply to the railway traction and also for the stations and depots. About 75 MW of power will be required a day for the project. Transco will be supplying 130 KV power, which will be scaled to 25 KV for the traction. It will 35 KV for the other auxiliary services at the depots/stations.
Four key substations are coming up for the project at Uppal, Miyapur, Yousufguda and Mahatma Gandhi Bus Station (MGBS) Imliban. Construction at the five-acre Uppal site inside the depot is in an advanced stage of completion, while work on the Miyapur substation is set to begin on another five-acre site. These two are the main power receiving stations.
Free land to Transco
It is the same case with the Yousufguda substation where construction is expected to begin soon. Land at MGBS is yet to be delineated and these substations will be on one-acre sites each. Land has been given free to Transco for constructing these facilities with built in redundancies and extra cabling.
“The power supply system is being designed in such a manner that power can be drawn seamlessly from across any of the three corridors in case of a problem or failure on a particular stretch or corridor,” explained Mr. Reddy.
Source: click here

Translate to English
Translate to Hindi

5426 views
0

Jan 03 2013 (19:22)
WDP 4   367 blog posts
Re# 629461-1              
Lack of skilled engineers: Hyderabad Metro Rail settles for old power supply system at cost of esthetics
---
HYDERABAD: Hyderabad Metro Rail project touted to be at global standards being executed under first ever private-public partnership (PPP) model has shunned modern Third Rail technology of power supply for the train, and decided to stick to the age-old overhead line system called AC Traction. Shockingly, the reason given is lack of skilled engineers able to handle the modern technology.
"The
...
more...
intention is to adopt a cutting edge technology in every possible aspect of the Hyderabad Metro Rail project. However, when it comes to seamless power supply for the train, we preferred a bit old trend of AC Traction, considering paucity of trained engineers able to handle Third Rail system that is modern trend across the globe. People need to be trained before going for such modern technology, and for now it is safe to settle for overhead line," said a senior official in Hyderabad Metro Rail Limited (HMRL).
However, in Bangalore the metro rail project has used the Third Rail system successfully, and even in Delhi the latest technology is adopted for the third stage of the metro rail in the stretch between Delhi and Gurgaon without any hitch. Interestingly, L&T that is executing Hyderabad Metro Rail project as the concessionaire is also the builder of Bangalore Metro Rail project. And there is no convincing answer from HMRL authorities on this discrepancy.
Third Rail system is the modern technology wherein the power supply line is placed in between the two track of the rail, and the train gets the seamless power supply as it runs on the tracks, where as the AC traction system supplies the power through an overhead line running along the track. The third line system supplies 750 volt DC voltage (direct current voltage, while the overhead line system provides 25 KV AC (alternative current voltage). And the experts feel, by any standard the third line system is preferred to the age-old overhead line system, as the modern trend call for. The overhead line system is not only deterrent to the aesthetics matching to the modern urban transport system such as metro rail, but also scores negatively in terms of cost effectiveness.
"Any modern metro rail project uses the Third Rail system for power supply, as it is cost effective and minimizes the maintenance issues. The structure cost, and maintenance cost is at higher side for AC Traction system apart from it is being considered as an old trend, across the globe, as far as esthetics is concerned," said Prof. M N Srihari, advisor to the Government of Karnataka on infrastructure and traffic, who is over viewing Bangalore metro rail project.
According to Srihari's estimation, the Third Rail system costs over 25 % less than the AC Traction system. However, authorities at HMRL are looking at it from safety point of view given the engineers are trained in the old overhead line system, and they told TOI that they didn't want take risk.
"The biggest issue here is safety. We feel the overhead lines are safer, as we are well versed with the system. With the Third Rail system, risk involves in evacuation the passengers, when the train trains stops in middle due to any technical snag. And it is riskier near stations, where the movement of the passengers is at its maximum," said the HMRL official.
He said with over head line system, the rolling stock (train set including engines and bogeys) with higher passenger capacity up to 80000 phpdt (peak hour peak direction traffic), while the rolling stock with third rail system could handle just 50000 phpdt. He also said the AC Traction was cost effective in terms of energy consumption, as the third rail system used DC power that is expensive.
The authorities said HMRL had entered an agreement with AP Transco for uninterrupted power supply to the railway traction and also for staion and depots. About 75 MW of power will be required a day for the project. Transco will be supplying 130 KV power, which will be scaled to 25 KV for traction.
Source: click here

Translate to English
Translate to Hindi

1 Public Posts - Mon Jan 07, 2013

8 Public Posts - Wed Jan 09, 2013

2 Public Posts - Thu Jan 10, 2013

2 Public Posts - Sat Jan 12, 2013

2 Public Posts - Fri Jan 18, 2013

2 Public Posts - Sat Jan 19, 2013

1 Public Posts - Sun Jan 20, 2013

4 Public Posts - Mon Jan 21, 2013

1 Public Posts - Tue Jan 22, 2013

1 Public Posts - Thu Jan 24, 2013

1 Public Posts - Sat Jan 26, 2013

1 Public Posts - Wed Jan 30, 2013

1 Public Posts - Thu Jan 31, 2013

2 Public Posts - Thu Feb 28, 2013

1 Public Posts - Sun Mar 03, 2013

3 Public Posts - Mon Mar 11, 2013

1 Public Posts - Thu Mar 14, 2013

4 Public Posts - Wed Mar 20, 2013

3 Public Posts - Thu Mar 21, 2013

2 Public Posts - Mon Mar 25, 2013

2 Public Posts - Tue Apr 02, 2013

2 Public Posts - Wed Apr 03, 2013

1 Public Posts - Thu Apr 04, 2013

4 Public Posts - Fri Apr 05, 2013

2 Public Posts - Wed Apr 10, 2013

4 Public Posts - Sun Apr 14, 2013

1 Public Posts - Sun Apr 21, 2013

2 Public Posts - Mon Apr 29, 2013

8 Public Posts - Fri May 10, 2013

1 Public Posts - Sat May 11, 2013

2 Public Posts - Tue May 14, 2013

1 Public Posts - Mon May 20, 2013

1 Public Posts - Tue May 21, 2013

1 Public Posts - Sat May 25, 2013

3 Public Posts - Tue May 28, 2013

1 Public Posts - Wed May 29, 2013

3 Public Posts - Tue Jun 04, 2013

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy