Somewhere and something has gone wrong in posting timings of the train. How can this train crawl at 20km/hr from BPL-ET and take 4hr 35m for 90 km run.
Admin pls recheck the timings, it will run on KSK (12650) schedule and will reach NGP at 2210hrs.
PS: Either you have posted wrong info or the source is wrong.