Rail Electrification:
Moradabad-Roza Section will be Energized with 25000 Volt 50 Hz AC current after 24.08.2012 and onwards will be treated as LIVE all the times
Hello Railfan86,
Sir I haven’t travelled on this route (Lucknow-Rae Bareli-Varanasi) in recent past so I can’t tell you the current status of Track doubling of this route though 5 months ago I went to Allahabad via Rae Bareli, and at that time there was no such work was going on Lucknow- Rae Bareli track nor there is any news about it, as far as I know.
As of now only Phaphamau-Prayag track doubling tender has been issued which lies on Lucknow-Raebarely- Allahabad route but whether work has started or not I don’t...
more... know.