*this post is link with Entry 380475
ABOUT ATTACHMENT/DETACHMENT OF PC OF 12859/60
the composition -SLR-GEN-GEN-A2-A1-B2-B1-S14-PC-S13-S12-S11-S10-S9-S8-S7-S6-S5-S4-S3-S2-S1-GEN-LDS will stand at maintenence yard after arriving Howrah Jn @ 12.30 hrs.
Then, the composition will be spillited into two parts:-
1....
more... -SLR-GEN-GEN-A2-A1-B2-B1-S14-PC
2. -S13-S12-S11-S10-S9-S8-S7-S6-S5-S4-S3-S2-S1-GEN-LDS
the S13-S12-S11-S10-S9-S8-S7-S6-S5-S4-S3-S2-S1-GEN-LDS will be taken to other line for sometime.
Now, in the -SLR-GEN-GEN-A2-A1-B2-B1-S14-PC is standing on another line. The PC is now at the end not at middle. So,it will be easy to detach.So, PC will be detached and taken to 3rd LINE.
Then -SLR-GEN-GEN-A2-A1-B2-B1-S14-PC will be brought to S13-S12-S11-S10-S9-S8-S7-S6-S5-S4-S3-S2-S1-GEN-LDS and joined together.
The rake formed is -SLR-GEN-GEN-A2-A1-B2-B1-S14--S13-S12-S11-S10-S9-S8-S7-S6-S5-S4-S3-S2-S1-GEN-LDS
Now This rake will leave Howrah at 19.00 hrs as Shri Jagannath Express.