for this train and all SBC-GTL trains already GY is well connected to SBC,DMM,MAS so every train passing via it towards GTL,RC OR BAY may be run via kalluru,GTL(without touching GY)which will automatically put offload on GTL-gy lane there by clearing way for SC,DHONE,DMM much faster.removing stops at GY,MALM will be more appreciable