The track seems under construction(unless location is clear we can assume only),
The Ballast on track are not evenly spread(giving credibility to first point),
The other side visible track are well laid(another point with gives credibility to first point),
Rail can not run on these tracks(Please ask any P WAY eng about it),
Sleeper...
more... deign is not Indian type.
*May be a computer modified picture posted for fun :
bit.ly/ntAeLX (source site).