There are 4 other trains as per some reports (Malabar,Parasuram etc). Also railways has asked for speeding up these trains to the maximum extent possible. Will that be done, it remains to be seen. There are so many other constraints like paths, pf availability etc and some of them also look at daily passengers.
Not sure if the railways will be able to do the same.