This will be diverted via Sambalpur City just like 22805/06 ? Also, PRR and BKSC will be give halts. That was not required because it is making the route longer. They could have done what they hve proposed for 22811/12 ADRA-IPTN-BKSC-GMO by a reversal at BKSC.