It is very annoying that ...maximum time this train departs PNBE Right time but fails to maintain punctuality till JHD. The schedule has been made agressive but never done that.
The 2nd linked point is that i have seen a post that in PNBE- GAYA section y the train running slow even after double electrified line? And answer give by danapur division is of unmanned railway crossing. Ye this one is right but till from double electrification no any steps has been taken by division to sort out this problem. Now a days the accidents at unmanned railway crossings has been drastically increased. The complete negligence And failure of Danapur Division.