Height of DD is really an issue, as it may infringe with the bottom of over bridges/ edges of platform shelters/ edges of platforms. New route have to be surveyed/studied in this respect, before operating DD on the route. At least the width of this DD rake is lesser than the original HWH-DHN rake, we can hope that major problem shall not arise.