Ankapur is located between NZB and Armoor, so if we go by road the works at first crossing are still going on. It looks like the train will cross NH16 on the road itself, hope they do something like make the road go under the tracks (since the tracks are already laid, they are no chances of constructing ROB there). And there is a big 2 way ROB at the second crossing. The attached picture doesn't show the ROB but it has been already constructed. Google hasn't updated the map.