Oh, I didn't know about the GC part. I traveled to CGL in Mid-July, and by that time, practically all of the MG track was completely lifted, except for a short stretch under the flyover at Vandalur. and there was no construction activity of any kind all along the route. I thought that was the end of 3 line operations on this route!