Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri May 3 19:42:58 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 1937899
Posted: Jul 22 2016 (17:11)

6 Responses
Last Response: Jul 22 2016 (17:18)
Social
14942 views
0

Jul 22 2016 (17:11)   HWH/WAP-4E/22573
 
guest
Entry# 1937899            Tags   Past Edits
Indian Railways Electrification- Marching towards a better environment
TODAY · PUBLIC
#Introduction/Overview:
In rail budget 2016-17, Hon’ble Minister of Railways Suresh Prabhu, announced that Railways have increased the outlay for railway electrification by almost 50% and propose to electrify 2,000 kms in the present financial year. Hon’ble MR, while presenting the railway budget said that complete railway electrification will not only
...
more...
be environment friendly but also economical.

Translate to English
Translate to Hindi

1 Posts

4122 views
0

Jul 22 2016 (17:15)guest
Re# 1937899-2              
@1937899-0  @guest
Plan wise progress of electrification on IR
In the wake of industrial development in India and to cope with the growing traffic, electrification and dieselisation had to be introduced in the early 1960s. After the completion of the pre independence era i.e from 1925-1947, Indian Railways had electrified only 388 route-kilometres (rkm).
At the end of first Five Year Plan, Indian Railways had electrified 141 RKM was electrified. During the second plan, the electrification was extended up to 216 RKM. In the Third Plan, electrification was extended over another 1,678
...
more...
rkm. In the Annual, fourth, fifth, Inter-plan and sixth plan around 814, 953, 533, 195 and 1522 RKM respectively was electrified.
The pace of electrification was considerably speeded up and Indian Railways achieved progress of 2,812 rkm during the 7th Plan, 2,708 rkm during 8th Plan and 2,484 rkm during 9th Plan making a total of 16,001 rkm. In the 10th Plan, electrification of 1,810 rkm was achieved. In the recently concluded 11th Plan (2007–12) electrification of 4,556 rkm was achieved. By the end of 11th plan, 4556 RKM was electrified, increasing the cumulative number to 2224 RKM.
Six major trunk routes of the Golden Quadrilateral and diagonals i.e. Delhi — Mumbai via Central and Western Railways, Delhi — Chennai, Mumbai — Calcutta and Howrah—Chennai have already been fully electrified. Electrification of remaining Mumbai — Chennai Route (Nandalur — Pune) is in progress. A total of 1317, 1350, 1375, 1730 RKM in the financial years 2012-13, 2013-14, 2014-15 and 2015-16 was taken up for electrification respectively. According to the plan, a total of 2000, 2000, 2135 and 2135 RKM will be taken up for electrification in the years 2016-17, 2017-18, 2018-19 and 2019-20 respectively.

Translate to English
Translate to Hindi

4252 views
0

Jul 22 2016 (17:16)guest
Re# 1937899-3              
@1937899-1  @guest
Action Plan:
1. 18 New Electrification Projects included in Pink Book 2016-17 comprising 2569 RKM at a cost of Rs 2741 Crore, for which mandatory approvals and sanctions are in progress.
2. Electrification 24 Nos. railway routes (3276 RKM) have been included under Capital Investment Programme, through Joint Venture/SPVs/Partnership with State Government & Stake Holder, in Rail Budget 2016-17.
3.
...
more...
In lines of Hon’ble MR’s Budget pronouncement (2016-17), routes covering 11717 rkms have been identified for electrification through Extra Budgetary Resources (EBR) funding. Proposal for undertaking electrification of 72 Nos. routes have been processed for ‘In Principle’ approval of Board.

Translate to English
Translate to Hindi

4246 views
0

Jul 22 2016 (17:17)guest
Re# 1937899-4              
@1937899-3  @guest
PROJECT IMPLEMENTATION:
A number of steps have been taken by the Indian Railways to improve project delivery:
1. Bringing in Efficiency through modernisation in Railway Electrification: · Self-Propelled Wiring Train: for simultaneous stringing of Catenary and Contact Wires · Self-Propelled Multi Utility cum-Mast Erection Vehicle: for efficiency and reduction of Block time
2. EPC Contract on a pilot basis: Delhi-Rewari-Jaipur- Phulera-Ajmer
...
more...
RE work on EPC Contract Request-for- Proposal (RFP) opened on 02.05.16 at Central Organisation for Railway Electrification (CORE), Allahabad, and is presently under consideration.
3. Delegation of tender acceptance and sanction of detailed estimate power to General Managers
4. Implementation of Projects through Railway PSU
5. RVNL executing 300 RKM per year. Steps taken to enhance RVNL’s electrification output to 1000 RKM per year.
6. Creation of New Window for funding of Electrification Projects through Institutional Funding Mechanism.
New technological developments in electric traction:
1. 2X25,000 Volts OHE system against 25,000 Volt OHE system on Eastern and Western DFC to reduce number of TSS and increase number of trains in the section.
2. High rise OHE of 7.5 mts to carry double stack container traffic Western DFC
3. Intelligent Tower Car for predictive maintenance of OHE.
4. Mechanized Wiring Train for Railway Electrification

Translate to English
Translate to Hindi

4647 views
0

Jul 22 2016 (17:18)guest
Re# 1937899-5              
@1937899-4  @guest
Achievements so far (2015-16):
1. Varanasi - Janghai Unchahar incl Phaphamau - Prayag Allahabad electrification commissioned.
2. Ghaziabad - Meerut - Saharanpur electrification commissioned.
3. New Delhi to Lucknow connected on electric traction via Moradabad- Ghaziabad - Moradabad electrification commissioned.
4.
...
more...
Electric traction reaches Mettupalayam: Coimbatore- Mettupalayam electrification commissioned.
5. Electric traction reaches Gorakhpur: Bhatni – Gorakhpur -Domingarh opened on electric traction. Gonda – Basti commissioned.
6. Domingarh – Basti to be commissioned shortly.
7. Alwar - Rewari electrification commissioned. With this Mathura -Alwar - Rewari is completed on electric traction.
8. Barauni - Mansi electrification commissioned Manmad - Daund via Shirdi connected on electric traction -Puntamba-Daund electrification completed.
9. Gooty – Dharamavaram electrification completed.
10. Laksar - Haridwar electrification completed.
11. Garwa Road - Meralgram electrification commissioned.
12. Kozikode - Kannur - Charvattur electrification commissioned.
13. Ib - Jharsuguda - Lapanga electrification commissioned.

Translate to English
Translate to Hindi

4730 views
0

Jul 22 2016 (17:18)guest
Re# 1937899-6              
@1937899-5  @guest
Other developments:
1. Electrification of Railway tracks to be made a NATIONAL MISSION for energy security & energy efficiency.
2. New Railway Electrification projects of about 10000 RKMs to be sanctioned in next three years. Availability of funds @ Rs. 3000-3500 Crores per annum should continue.
3. All port connectivity routes, DFC feeder routes, HDN routes, missing links
...
more...
are to be electrified.
4. Projects costing Rs. 1000 Crore and above should only be sent to NITI Aayog for In-Principle Approval.

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

3619297 ★★★ 371HBR~
6009830 ★★★ 46jishnuthakur12301^...

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy