survey completed between kurnool - somayajulapalli and to connect this line to betamcherla in guntakal-guntur line, as CM CBN announced last month 17 that a railway line needed for ORVAKAL industrial hub to connect on both sides hyderabad, guntur line.
***continuation as the previous post is archieved***