Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Tue Apr 30 21:16:34 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 1592868
Posted: Sep 17 2015 (17:44)

2 Responses
Last Response: Sep 17 2015 (21:41)
2 Followers
Info Update
52018 views
11

Sep 17 2015 (17:44)   CRJ/Chittaranjan (3 PFs)
 
guest   6387 blog posts
Entry# 1592868            Tags   Past Edits
============= IGBT A Detailed Study =============
#railwayengineering
#ExploringIGBT
Here I have Shared the Images of the Following:
1 Pneumatic Panel of G-9 and P-7
2
...
more...
Temperature Sensor of 3-Phase Locomotive(Made by Crompton Greaves here)
3 Static Converter of IGBT Based 3-Phase Locomotive
4 Water Cooled IGBT Modules replacing GTO Thyristors now(Image 4,5 & 6)
Advantages of IGBT over GTO:
Earlier when a 3 Phase Locomotive would become dead, the Entire Bogie(Forum Please Note that "Cab-1" of the Loco is referred as "Bogie 1" in GTO and "Cab-2" of the Loco is referred as "Bogie-2" in GTO)would not work. Now with the help of IGBT technology even if one motor becomes dead, with the help of computer electronics it can be isolated and the Locomotive can still be made to run with the help of the other motors. This is one of the added advantages of IGBT over GTO in 3 Phase. Water Cooled IGBT module that is replacing GTO Thyristors. Basically what we see in today's G9/P7/P5 as suffix "i" is nothing but these semiconductor devices that have replaced the old GTO Technology.
Advantage: Better Switching, Fast Response .In Locomotive if a motor fails, the entire bogie need not be separated and the particular motor is separated using this technology.The IGBT Modules are made by Bombardier and they are imported from Germany and assembled here in India.
Machine Room Components of a 3-Phase Loco:
The machine room of a 3-Phase Loco consists of :-
1) Scavenge Blowers (A cenrifugal filter panel where contaminated air is removed via a scavenge flow system).
2) Transformer
3) Machine Room Blower
4) Oil Cooling Units (transformer/converter)
5) Traction Motor Blowers
6) Single phase 415/110V auxiliary circuit
7) Vigilance Control Module
8) Pneumatic Panel
9) Line Converter
10) Auxiliary Converter
11) Oil Pump and fan
12) Static convertor
Why 3-Phase Loco Production is SLOW in CLW?
Ans: CLW had planned to deliver more 3 Phase Loco’s but due to inadequate supply of electronic components by various companies they had to slow down the process of production of 3 Phase Loco’s.(As replied by Dy CEE, CON, (CRJ)). Now I think this Problem is solved and from the coming Month we can see ONLY 3-Phase Locos will be turned out by CLW as already announced by Mr C.P Tayal, Hon'ble GM of CLW.(BLOG already shared here)
All these Data and Images are taken from the "Trip Report to CLW" made by Sunadar Mukherjee, IRFCA Member.
Courtesy: Sundar Mukherjee
Here is the Detailed Trip Report of Sunder Mukherjee to CLW: click here
Forum can view the Entire CLW Workshop where 3-Phase & Conventional Locos are built from the above Link and many more info about CLW from the above Link of Detailed Trip Report of Sunder Mukherjee to CLW .

Translate to English
Translate to Hindi

6328 views
3

Sep 17 2015 (18:35)
guest   6387 blog posts
Re# 1592868-1              
Here is the Link for the "Detailed Infrastructure" of CLW:
CLW Infrastructure
Translate to English
Translate to Hindi

5968 views
4

Sep 17 2015 (21:41)
guest   6387 blog posts
Re# 1592868-2              
Re-engineering of Stators of Three phase Traction Motors type 6FRA 6068 used in
WAG9/WAP7 locomotives for Improving their Reliability-------
Written by :R.N.Lal ,Senior Executive Director Standards , Ganesh , Director Standards
Electrical Directorate , Research Design and Standards Organisation , Lucknow
PDF
...
more...
Link: click here
(Document Attached)

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy