I agree that the tracks from Burdwan to Asansol via Durgapur are getting saturated. I am proposing for separately new double electrified tracks that can start from Dankuni and head straight to Asansol for joining at the ASN Cabin's outer. Those tracks can be capable of 200 Kmph and if not a Gatiman then at least a new Howrah - Gaya Shatabdi can start on such a speedy corridor and then proceed towards Dhanbad. The new corridor can bring down the 3 Hours Non-Stop HWH-ASN Run to about 1.5 - 2 Hrs or so... this is my proposal :)