The latest status is as under:
.
PUNE-DD Electrification:
- No poles from Ghorpuri (Yard) outer to Hadapsar, reason might be pending shifting of some HT wires crossing tracks at low levels.
-...
more... From Hadapsar to Yevat, poles + wires installed
- From Yevat to Kadethan, only poles (no wires)
- At Kadethan station, poles are installed on platform
- No poles from Kadethan to Patas
- From Patas, further upto Daund, some poles are observed
- Poles in Daund Yard + Bhima Bridge, without wires
- Also from Daund to Bhigwan, holes for poles have been dug up.
.
DD-MMR Electrification:
- Poles have come up at Daund station and Yard. Poles can be found on Bhima Bridge, but yet to be wired.
- Poles + Wires are installed from Kashti station onwards right upto Ankai Station and Manmad outer including Puntamba-Shirdi branch line.
.
#electrification