Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sun May 5 00:43:28 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 1168424
Posted: Jul 22 2014 (14:41)

12 Responses
Last Response: Jul 24 2014 (16:38)
Rail Fanning
10446 views
18

★★★
Jul 22 2014 (14:41)   56616/Nilambur Road - Shoranur Fast Passenger (UnReserved) | NIL/Nilambur Road (2 PFs)
 
Jayasankar Madhavadas
Jayasankar Madhavadas   458 blog posts
Entry# 1168424            Tags  
NIL - SRR passenger with the ERS workhorse all set to depart the picturesque Nilambur ....
Translate to English
Translate to Hindi

8 Public Posts - Tue Jul 22, 2014

4845 views
1

Jul 22 2014 (21:06)
PKV~
PKV~   25536 blog posts
Re# 1168424-9              
Very true Jaya. And here are the major achievements of the Council.
ACHIEVEMENTS:
1)Timings were revised and connection to Parasuram Express obtained.
2)Extension of NIL-SRR Passenger to Palakkad obtained.(We thought an extension outside would save closure of the line)
3)ORGANISED
...
more...
A 'RAIL ROKO' AT SHORANUR AGAINST NEGLECT OF NILAMBUR LINE BY BLOCKING PARASURAM EXPRESS FOR 2 HOURS in 1997.
Immediate provocation was Railway's reluctance to run DEMU sanctioned for Nilambur.
4)Railways ran DEMU in the route the next week.
5)A sit in protest on rail track (2nd Line) at Vaniambalam,to protest against degrading the station and attempts to dismantle the 2nd line.
6)The photos of poor condition of track between Melattur and Nilambur were taken and sent to PM,Railway Board,Ministers and MPs.The speed was 50 kmph between MLTR and SRR and 40 KMPH between MLTR and NIL.The speed was a paltry 20 Kmph between MLTR and Tuvvur.(These tracks had wooden sleepers and had light rail,which would not allow higher speed)
FINALLY IN 2000-01 RAIL BUDGET,SANCTION FOR COMPLETE RAIL RENEWAL WAS ORDERED BY Kum.MAMATHA BANERJEE.
7)A cut trip of DEMU was run between SRR and AAM due to our efforts.
8)The trip extended to NIL as FP to connect Venad Express (3rd train)
9)Track renewal between Melattur and Nilambur started.
10)PRS centre sanctioned at AAM,on our pettition to Sri.O.Rajagopalji,Hon MOSR who visited AAM.
11)Survey ordered for NIL-Bathery-Nanjangud line.Reception given to Sri.O.Rajagopal at Kalpetta and Nilambur.
12)Attempts to get a morning train started in 2006.At last a train halting at Nilambur started running in January 2007.(Find reception photos in the album)This was one of our major acheivements.(4th Train)
13)2nd PF at AAM.
14)The plea to run an extra noon train using the idling rake of ERS-SRR Passenger was raised in Divisional Railway Users Consultative Committee meetings.This was agreed and in August 2007 a new trip serving as direct service from Nilambur to Ernakulam was started.(5th Train)
15)Angadipuram-Malappuram-Kozhikode line survey ordered.
16)Our plea to improve amenities at small halt stations agreed and works started at Melattur,Thodiyapulam and Pattikad.
All stations in the route were sanctioned PF lights,shelters,toilets and benches.
17)Proposal for new crossing stations at MLTR and KLKLR agreed and proposed by Palakkad division.
18)PF stalls at AAM and NIL.Earlier no food item was available in the route.
19)A walkway connecting PF 1 and 2 at AAM.
20)Combined UTS cum PRS at Nilambur in May 2009.
21)OFC cable laying and Signalling works started,due to our pleas.Late running of trains due to signal failures and broken overhead telephone lines were a regular feature.
22)Mr.E.Ahmed Ji assumes charge as MOSR.FCI godown at AAM reopened.
23)New evening train sanctioned.Inaugural run in August 2009.
24)Combined UTS cum PRS at Vaniambalam.
25)Complete Concrete sleeper laying and new track laid between Melattur and Shoranur.
27)Platform works at Vadanamkurishi,Vallapuzha,Cherukara,Tuvvur Vaniambalam and Angadipuram started.
28)Nilambur declared 'Adarsh' station.New modern Waiting hall inaugurated during GM's visit on Jan 5th 2011.Discussions held with GM and officers regarding NIL-TVC Express train.
29)New station buildings with second entry at NIL and AAM sanctioned. Foundation stones for development works laid by Mr.E.Ahmed on 12-01-11.
Hon Minister travels by train to Nilambur.
30)Efforts on for direct train to Thiruvananthapuram.(Details on Rajya Rani page)
31)Rajya Rani Exp announced in Rail budget 2011.
32)New goods shed at NIL sanctioned in budget.
33)Complete track renewal and concrete sleeper laying between Melattur and Nilambur sanctioned in budget.
34)NIL-SBY-Nanjangud line gets sanction in principle by Railway Board.
35)Resurvey for AAM-CLT and Nanjangud lines.
36)Section speed increased to 75 KMPH on 14-11-11.
37)Rajya Rani Exp inaugurated on 16-11-11.
38)Preliminary works to realign 3rd line (FCI line) at AAM so as to widen 2nd PF at AAM and provide PF shelter,Foot overbridge started.FCI line to be lengthened to hold 20 wagons.
39)Rail level temporary 2nd PF provided at VNB.
40)Tender called for new station building at Angadipuram.
IT HAS BEEN SUCCESSFUL IN LINKING NILAMBUR TO THE STATE CAPITAL,THIRUVANANTHAPURAM AFTER THE INTRODUCTION OF NILAMBUR-THIRUVANANTHAPURAM RAJYA RANI EXPRESS ON 16th NOV 2011.

Translate to English
Translate to Hindi

2 Public Posts - Tue Jul 22, 2014

1 Public Posts - Thu Jul 24, 2014

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

3242050 ★★★ 349~
5257556 ★★★ 133jishnuthakur12301^...

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy