Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Sat Apr 20 09:54:54 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
Close-up; Side View; Large TB; EOG/SLR; Outside of Train;
Entry# 4658462-12
Side View; Large TB; EOG/SLR; Outside of Train; Standing at Station;
Entry# 4658462-216


06346/Netravati Express Special
नेत्रावती विशेष एक्सप्रेस

TVC/Thiruvananthapuram Central (Trivandrum) --> LTT/Mumbai LTT

Latest News
(You need to double-check/verify this info yourself)
Regular service restored
Sun Nov 21, 2021 (11:37AM)
News History
0 Follows
Bedroll/Linen: Don't know change
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✕ E-Catering
TRAIN IS CANCELLED
Dep:
Arr:
RSA - Rake Sharing
4 Dedicated Rakes. PM - TVC
Rating: 5.0/5 (17 votes)
cleanliness - excellent (3)
punctuality - excellent (3)
food - excellent (3)
ticket avbl - excellent (3)
railfanning - excellent (3)
safety - excellent (2)
LHB Rake

Rake/Coach Position

  0
  L
  1
EOG
  2
 D1
  3
 S1
  4
 S2
  5
 S3
  6
 S4
  7
 S5
  8
 S6
  9
 S7
 10
 S8
 11
 S9
 12
S10
 13
 PC
 14
 B1
 15
 B2
 16
 B3
 17
 B4
 18
 B5
 19
 B6
 20
 A1
 21
 D2
 22
EOG
 23
HCP
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train News

Page#    24 News Items  next>>
Sep 05 2021 (21:53) To improve train operations & boost tourism, Indian Railways completes double line work on Roha-Veer section (www.financialexpress.com)
Other News
77935 views
1

News Entry# 464085   
  Past Edits
Sep 05 2021 (21:53)
Station Tag: Veer/VEER added by MCPNBR/261443

Sep 05 2021 (21:53)
Station Tag: Roha/ROHA added by MCPNBR/261443
The total length of this double line is 46.8 kilometres and the total cost of this doubling project is Rs 530 crore.
Indian...
Sep 01 2021 (20:04) 1st train plies on double-tracked Roha-Veer route (timesofindia.indiatimes.com)
New Facilities/Technology
KR/Konkan
95981 views
4

News Entry# 463620   
  Past Edits
Sep 01 2021 (20:04)
Station Tag: Veer/VEER added by Rail Fanning/718429

Sep 01 2021 (20:04)
Station Tag: Roha/ROHA added by Rail Fanning/718429
Posted by: RFIR~ 569 news posts
The track doubling work between Roha (Central Railway) and Veer (Konkan Railway) spanning 47km was completed on Monday. The work had commenced in October 2016.
The...

Rail News
94128 views
1

Sep 01 2021 (20:43)
RFIR~
RFIR~   6833 blog posts
Re# 5056489-1              
Hope as and when doubling happens, travel time in KR gets further reduced
Translate to English
Translate to Hindi

Rail News
71276 views
0

Nov 06 2021 (10:07)
Atmathew58~
Atmathew58~   140 blog posts
Re# 5056489-2              
Kindly operate trains with electric traction as well from Mumbai to Ratnagiri and save on diesel fuel consumption
Translate to English
Translate to Hindi
Sep 01 2021 (00:11) Line doubling completed on Roha-Veer section (www.thehindu.com)
KR/Konkan
80515 views
6

News Entry# 463532   
  Past Edits
This is a new feature showing past edits to this News Post.
Konkan Railway Corporation Ltd. (KRCL) completed line doubling work on a 46.8 km stretch between Roha under Central Railway and Veer (KRCL) on Monday.
...

2 Public Posts - Wed Sep 01, 2021

57722 views
0

Sep 02 2021 (08:43)
A2Z~
A2Z~   17505 blog posts
Re# 5055867-3              
@5055867-2  @guest
** It seems that there is more traffic on Roha-Madgaon section, so more saturation
** More over Roha-Madgaon is hilly terrain, so limited line capacity and more difficult to double
Translate to English
Translate to Hindi

55057 views
0

Sep 03 2021 (07:54)
A2Z~
A2Z~   17505 blog posts
Re# 5055867-5              
** KR has the expertise of handling new rail line projects in hilly terrains, especially in long tunnel construction.
** But IR is not giving due consideration to capacity augmentation of KR
It is neglected even in the futuristic National rail plan-2030
Translate to English
Translate to Hindi

54484 views
2

Sep 03 2021 (07:54)
A2Z~
A2Z~   17505 blog posts
Re# 5055867-6              
** KR deserves to be part of famed and very important "national Heavily Utilised (HUN) Network", for that to happen KR needs to be merged with IR or IR has to take initiative & actively support KR in this regard.
**
Following expansions/extensions need to be completed in next 10 years and should have been a part of "National Rail Plan"
- Doubling of
...
more...
full stretch and
- hinerland connectivities (Karad-Chiplun, Kolhapur Vaibhavwadi, Hubli-Ankola, Talguppa Honnavar and
- port connectivities (Digni- Jaigarh port, Roha-Dighi port, & other new ports being planned) are a must by 2030

Translate to English
Translate to Hindi

54243 views
0

Sep 03 2021 (10:11)
skm^~
skm^~   2113 blog posts
Re# 5055867-7              
KR regional connectivity well explained...
KR has identified 3 sections for future Doubling, these are...
Vaibhavwadi Rd to Madure ( Maha-GOA border) : 88 kms
Madgaon to Balli : 16 kms
Udupi to Thokur
...
more...
: 46 kms..
These 3 sections do not have tunnels & relatively easier to double...
However, the execution of Roha-Veer ( 47 kms) took 5 years, at a snail pace..
KR will have to start work on these 3 sections simultaneously and with better execution, it will further ease out operation on KR..

Translate to English
Translate to Hindi

47722 views
0

Sep 04 2021 (07:42)
A2Z~
A2Z~   17505 blog posts
Re# 5055867-8              
**During the period of Mr Prabhu, it was reported that the doubling shall be done simultaneously in a few more stretches in addition to Roha-Veer, but that could not materialize.
** KR want to do doubling of long tunnels in the last phase to double maximum route KMs at minimum cost in shorter time.
Translate to English
Translate to Hindi

Rail News
128588 views
0

Aug 23 2021 (15:03)
A2Z~
A2Z~   17505 blog posts
Re# 5047967-1              
Doubling of Roha Veersection (47kms) is almost complete. Trains are probably regulated for Non Interlocking works.
Translate to English
Translate to Hindi
Mar 18 2021 (20:46) Diversion of Trains (sr.indianrailways.gov.in)
SR/Southern
IR Press Release
42430 views
0

News Entry# 445769   
  Past Edits
This is a new feature showing past edits to this News Post.
In connection with Doubling of Track between Ambalampuzha – Haripad in Ernakulam – Alappuzha – Kayankulam Section, following will be the changes in pattern of train...
read more... Diversion of Trains
Page#    24 News Items  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy