Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
News Super Search
 ↓ 
×
Member:
Posting Date From:
Posting Date To:
Category:
Zone:
Language:
IR Press Release:

Search
  Go  
dark mode

RailFanning is a gift you give yourself. - Varun

Full Site Search
  Full Site Search  
FmT LIVE - Follow my Trip with me... LIVE
 
Tue Jun 28 11:06:53 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

AMBG/Arambagh (Prafulla Chandra Sen) (3 PFs)
আরামবাগ (প্রফুল্ল চন্দ্র সেন)     आरामबाग (प्रफुल्ल चंद्र सेन)

Track: Single Electric-Line

Show ALL Trains
Station road , Arambagh , dist - hooghly
State: West Bengal


Zone: ER/Eastern   Division: Howrah

No Recent News for AMBG/Arambagh (Prafulla Chandra Sen)
Nearby Stations in the News
Type of Station: Regular
Number of Platforms: 3
Number of Halting Trains: 0
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 1.6/5 (4 votes)
cleanliness - average (1)
porters/escalators - n/a (0)
food - n/a (0)
transportation - poor (1)
lodging - poor (1)
railfanning - poor (1)
sightseeing - n/a (0)
safety - n/a (0)
Show ALL Trains

Station News

Page#    Showing 1 to 2 of 2 News Items  
Apr 20 2021 (21:07) CANCELLATION OF TRAINS DUE TO COMMISSIONING OF SINGLE LINE BETWEEN SINGUR-NALIKUL STATIONS (er.indianrailways.gov.in)
IR Press Release
0 Followers
101799 views

News Entry# 449178  Blog Entry# 4944098   
  Past Edits
Apr 20 2021 (21:07)
Station Tag: Haripal/HPL added by Anmol/2092590

Apr 20 2021 (21:07)
Station Tag: Arambagh (Prafulla Chandra Sen)/AMBG added by Anmol/2092590

Apr 20 2021 (21:07)
Station Tag: Singur/SIU added by Anmol/2092590

Apr 20 2021 (21:07)
Station Tag: Tarakeswar/TAK added by Anmol/2092590

Apr 20 2021 (21:07)
Station Tag: Seoraphuli Junction/SHE added by Anmol/2092590

Apr 20 2021 (21:07)
Station Tag: Howrah Junction/HWH added by Anmol/2092590

Apr 20 2021 (21:07)
Station Tag: Nalikul/NKL added by Anmol/2092590

Apr 20 2021 (21:07)
Station Tag: Singur/SIU added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Tarakeswar - Howrah Local/37348 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Tarakeswar - Howrah Local/37338 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Tarakeswar-Howrah Local/37330 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Arambagh - Tarakeswar - Howrah Local/37316 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Haripal - Howrah Local/37308 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Howrah - Tarakeswar Local/37343 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Howrah - Tarakeswar Local/37335 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Howrah - Tarakeswar Local/37327 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Howrah -Tarakeswar Local/37319 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Howrah - Haripal Local/37307 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Howrah - Tarakeswar Local/37309 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Haripal - Howrah Local/37308 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Arambagh - Howrah Local/37364 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Arambagh - Howrah Local/37362 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Tarakeswar - Howrah Local/37348 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Tarakeswar - Howrah Local/37334 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Tarakeswar-Howrah Local/37330 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Howrah - Haripal Local/37307 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Howrah -Tarakeswar Local/37323 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Howrah - Tarakeswar Local/37335 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Howrah - Arambagh Local/37363 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Howrah -Tarakeswar Local/37319 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Howrah - Arambagh Local/37361 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Singur - Howrah Local/37306 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Singur - Howrah Andolan Local/37304 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Tarakeswar - Howrah Local/37354 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Tarakeswar - Seoraphuli Local/37414 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Seoraphuli - Tarakeswar Local/37413 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Howrah - Singur Andolan Local/37305 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Howrah - Singur Local/37303 added by Anmol/2092590

Apr 20 2021 (21:07)
Train Tag: Howrah - Tarakeswar Local/37351 added by Anmol/2092590
Trains:  Howrah - Arambagh Local/37363   Arambagh - Howrah Local/37364   Howrah -Tarakeswar Local/37323   Howrah - Tarakeswar Local/37335   Howrah - Tarakeswar Local/37351   Arambagh - Howrah Local/37362   Howrah -Tarakeswar Local/37319   Howrah - Tarakeswar Local/37327   Howrah - Tarakeswar Local/37343   Tarakeswar - Howrah Local/37316   Tarakeswar - Howrah Local/37330   Tarakeswar - Howrah Local/37334   Tarakeswar - Howrah Local/37338   Tarakeswar - Howrah Local/37348   Tarakeswar - Howrah Local/37354   Howrah - Haripal Local/37307   Haripal - Howrah Local/37308   Howrah - Singur Local/37303   Singur - Howrah Andolan Local/37304   Howrah - Singur Andolan Local/37305   Singur - Howrah Local/37306   Seoraphuli - Tarakeswar Local/37411   Seoraphuli - Tarakeswar Local/37413   Tarakeswar - Seoraphuli Local/37412   Tarakeswar - Seoraphuli Local/37414   Howrah - Arambagh Local/37361   Howrah - Tarakeswar Local/37309   Tarakeswar - Seoraphuli Local/37416   Seoraphuli - Tarakeswar Local/37415   Seoraphuli - Tarakeswar Local/37417   Tarakeswar - Seoraphuli Local/37418  
Due to Pre Non-Interlocking & Non-Interlocking work in connection with the commissioning of single line between Singur & Nalikul stations, 240 minutes (23:30hrs. to 03:30 hrs.) will be imposed between Diara & Haripal from the night of 21/22-04-2021 to 24/25-04-2021.
Consequently, the following trains remain cancelled:
Cancellation of trains:
From Howrah: 37351 from 21.04.2021 to 24.04.2021
37303
...
more...
& 37305 from 22.04.2021 to 24.04.2021
From Seoraphuli: 37413 from 21.04.2021 to 24.04.2021
From Tarakeswar: 37414 & 37354 from 21.04.2021 to 24.04.2021
From Singur: 37304 & 37306 from 22.04.2021 to 24.04.2021
Additional cancellation of trains for avoiding bunching of trains on 23.04.2021/24.04.2021( Friday/Saturday)
From Howrah: 37361,37319,37363,37335,37323 & 37307
From Tarakeswar: 37330,37334 & 37348
From Arambagh: 37362 & 37364
From Haripal: 37308
Cancellation of trains from 25.04.2021 to 05.02.2022 (i.e. till re-introduction of Double Line working)
From Howrah: 37309,37307,37319,37327,37335 & 37343
From Haripal: 37308
From Tarakeswar: 37316, 37330, 37338, 37348, 37354, 37412, 37416, 37418 &
37414
From Seoraphuli: 37411, 37415, 37417 & 37413
Jun 11 2016 (05:20) Bengal role key to Rail track plans in the state: Suresh Prabhu (www.railnews.co.in)
New Facilities/Technology
KM/Kolkata Metro
0 Followers
87529 views

News Entry# 270620  Blog Entry# 2333625   
  Past Edits
Jun 11 2016 (5:20AM)
Station Tag: Goghat/GOGT added by Baaz SGUJ WDP4~/1476622

Jun 11 2016 (5:20AM)
Station Tag: Agarpara/AGP added by Baaz SGUJ WDP4~/1476622

Jun 11 2016 (5:20AM)
Station Tag: Arambagh P C Sen/AMBG added by Baaz SGUJ WDP4~/1476622

Jun 11 2016 (5:20AM)
Station Tag: Beldanga/BEB added by Baaz SGUJ WDP4~/1476622

Jun 11 2016 (5:20AM)
Station Tag: Plassey/PLY added by Baaz SGUJ WDP4~/1476622

Jun 11 2016 (5:20AM)
Station Tag: Tilbhita/TBB added by Baaz SGUJ WDP4~/1476622
Railway Minister commissions maiden first rehabilitated NGEF Metro Rake into commercial service at Dum Dum. Also inaugurates Coach Manufacturing Unit in West Bengal. Prabhu stresses upon increasing Railways infrastructure in the State!
Kolkata: Indian Railways is banking on joint ventures with state governments to meet its ambitious target of laying down tracks that will sustain high economic growth.
Railway minister Suresh Prabhu today said the target for 2018-19 was 19km of tracks daily against 7km daily in the last fiscal.
Prabhu
...
more...
said in the last six years the pace of commissioning of such broad gauge tracks was an average 4.3km per day.
The ministry is eyeing a gradual increase in the rate to about 13km a day in 2017-18 and to 19km per day in 2018-19.
“The joint venture is a completely new corporate entity with independent corporate structure. There would be 50 per cent equity participation from the railways and the rest from the state governments,” said Prabhu on the sidelines of an interactive session at the MCC Chamber of Commerce and Industries.
The railway ministry has signed a memorandum of understanding to set up joint ventures with Maharashtra, Odisha, Andhra Pradesh, Kerala, Chhattisgarh, Telengana and Karnataka.
The railway budget for 2016-17 has proposed 13 projects at an investment of Rs 33,092 crore through joint ventures. Another 30 projects involving a cumulative cost of Rs 58,275 crore have been included in the capital investment programme of 2016-17. However, Bengal is not yet included in the list of identified projects to be executed through a joint venture.
The joint venture route gains importance as it helps to mobilise debt from banks, financial institutions and multilateral agencies by leveraging the equity. It could help to expedite the ongoing projects and new project development in the future.
Prabhu said the next phase of economic growth would be facilitated by the transportation sector, including the railways.
The ministry is working on high-speed railway projects that can increase the speed of transportation and reduce the cost.
A high-speed passenger corridor is also being set up between Ahmedabad and Mumbai with an assistance from the government of Japan.
Railway Board officials who accompanied Prabhu said the production of wagons was expected to start from the Rs 120-crore joint venture between public sector steel giant SAIL and Rail India Technical and Economic Services Ltd.
The joint venture is called SAIL-RITES Bengal Wagon Industry Pvt Ltd. It has signed an agreement for an assured offtake with the railway ministry in November 2015.
Suresh Prabhu commissions maiden rehabilitated Metro rake at Dum Dum
The first rehabilitated NGEF rake has been put into commercial service from Dum Dum Metro station today after inauguration of the same by Suresh Prabhakar Prabhu, minister for railways from Howrah station. A total of seven old NGEF rakes have been planned for rehabilitation.
The ‘AC look-alike’ rehabilitated rake has improved passenger amenities like all interior panels replaced with anodized aluminium panels similar to AC rakes, old passenger seats and backrests replaced with new ones of polycarbonate material, transparent glass partisan panels for the seats provided similar to AC rakes, all existing handrails replaced with new ones, existing aluminium chequered flooring replaced by fire resistance PVC flooring similar to AC rakes, spray painting of exterior of the coach by PU paint after removal of old layer of paint, dilapidated windows replaced by new modified windows and existing vestibules replaced by UIC type vestibules including transparent sheet to improve day light at the vestibule area.
Also brought into function were audio visual passenger information system along with provision of LED type passenger route indication board provided, LED based electrical head code in the driving motorman coaches, existing ventilation fans replaced by low noise fans having better air discharge facilities, LED based tube lights provided in place of fluorescent type of tube lights in coach and 100 per cent replacement of tough floor strengthening of body bolsters and replacement of side barrier, replacement of emergency door of driving motor coach.
Prabhu inaugurates Coach Manufacturing Unit in West Bengal
Railway Minister Suresh Prabhuon Thursday inaugurated a coach manufacturing unit at Budge Budge in West Bengal.
He stressed upon strengthening the total infrastructure of the Railways while speaking at the inauguration and laying of foundation stone of several projects of Eastern, South Eastern, Metro Railway and RITES.
A foot over bridge at Agarpara and Tilbhita stations and double line between Plassey and Beldanga stations and new line between Arambagh and Goghat were inaugurated by the minister.
He laid the foundation stone of Vivekananda Meditation Centre at Howrah.

87284 views
Jun 26 2017 (18:03)
sayangarai32   7 blog posts
Re# 2333625-1            Tags   Past Edits
Arambagh required so much train in office time
Page#    Showing 1 to 2 of 2 News Items  

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy