Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Gallery Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Apr 20 03:42:37 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

SUBR/Subhagpur (3 PFs)
सुभागपुर
سوبھاگپور


Track: Single Electric-Line

Updated: May 05 2020 (17:16) by KhagariaJn^~
Show ALL Trains
NH 330, Gonda Balrampur Road, Distt.- Gonda, Pin - 271002
State: Uttar Pradesh

Elevation: 109 m above sea level
Type: Regular   Category: n/a
Zone: NER/North Eastern   Division: Lucknow NER


No Recent News for SUBR/Subhagpur
Nearby Stations in the News
Number of Platforms: 3
Number of Halting Trains: 6
Number of Originating Trains: 0
Number of Terminating Trains: 0
0 Follows
Rating: 2.8/5 (8 votes)
cleanliness - excellent (1)
porters/escalators - poor (1)
food - poor (1)
transportation - average (1)
lodging - poor (1)
railfanning - excellent (1)
sightseeing - average (1)
safety - good (1)
Show ALL Trains

Picture & Video Gallery

Page#    Showing 1 to 25 of 53 Pic/Video Blogs  next>>

SUBR/Sbhgpr
Subhagpur - Panchperwa the entire North Eastern Railway BG route is...
×

15322/Kplvst MG Exprss GD/Gnd
Meter Gauge pictures from Gonda Junction - March 2010Video Link: click...
×

04200K/Sshsn SF Spcl BLP/Blrmpr
Balrampur to Gonda Junction Latest Full Journey video ... Don't Miss...
×

GD/Gnd
CRS Inspection of Gonda Jn-Subhagpur Rail Electrification has been done and...
×

SUBR/Sbhgpr
रेल संरक्षा आयुक्त, उत्तर पूर्वी सर्किल द्वारा पूर्वोत्तर रेलवे के लखनऊ...
×

15081/Nkh Jngl  SUBR/Sbhgpr
Electrification of 1st phase of Gonda-Gorakhpur Loop line(i.e Gonda Jn to...
×

15706/Chmprn Hmsfr Exprss SUBR/Sbhgpr
पहली बार स्लीपर कोच के साथ चली गाड़ी संख्या 15706 कटिहार...
×

GD/Gnd
Construction of 2 new platform (PF-7&8) at old malgodam and 1...
×

14213/Vrns Bhrch GD/Gnd
Two no. of washing pit 650-650m length and over head water...
×

75128/Gnd Grkhpr SUBR/Sbhgpr
Approx all poles are straightened out and source says it is...
×

GD/Gnd
Construction of 2 Nos. of Washing Pit and a Over Headed...
×

75128/Gnd Grkhpr GD/Gnd
1- Foundation of Rail Electrification of Gonda...
×

GD/Gnd
Speed trial in Subhagpur Pachperwa section of Gonda Gorakhpur loop line...
×

15068/Bndr Trmns  GD/Gnd
Gonda Diesel Shed to Basti | Full Train Journey VlogVideo Link:...
×

SUBR/Sbhgpr
subhagpur
×

GD/Gnd
CRS Inspection of Gonda Jn-Subhagpur Rail Electrification has been done and...
×

SUBR/Sbhgpr
रेल संरक्षा आयुक्त, उत्तर पूर्वी सर्किल द्वारा पूर्वोत्तर रेलवे के लखनऊ...
×

15081/Nkh Jngl  SUBR/Sbhgpr
Electrification of 1st phase of Gonda-Gorakhpur Loop line(i.e Gonda Jn to...
×

GD/Gnd
Construction of 2 new platform (PF-7&8) at old malgodam and 1...
×

GD/Gnd
Construction of 2 new platform (PF-7&8) at old malgodam and 1...
×

14214/Bhrch Vrns GD/Gnd
Construction of rake handling platform at Old Malgodam(New Terminal Station) of...
×

75128/Gnd Grkhpr SUBR/Sbhgpr
Approx all poles are straightened out and source says it is...
×

GD/Gnd
Construction of 2 Nos. of Washing Pit and a Over Headed...
×

15081/Nkh Jngl  SUBR/Sbhgpr
तूफान में प्रवेश करती हुइ पूर्वोत्तर रेलवे की ट्रेन
×

05447/Grkhpr Gnd SUBR/Sbhgpr
Gorakhpur- Gonda Express Special At Subhagpur Railway station..RSA With Varanasi- Gorakhpur...
×

05448/Gnd Grkhpr BLP/Blrmpr
LATEST UPDATE Of Gonda -Gorakhpur LOOP LINE ELECTRIFICATION ,BALRAMPUR to JHARKANDI,BALRAMPUR...
×

SUBR/Sbhgpr
subhagpur
×

GD/Gnd
CRS Inspection of Gonda Jn-Subhagpur Rail Electrification has been done and...
×

BRK/Bhrch
Media release by NER regarding electrification. ...
×

15081/Nkh Jngl  SUBR/Sbhgpr
Electrification of 1st phase of Gonda-Gorakhpur Loop line(i.e Gonda Jn to...
×

GD/Gnd
Construction of 2 new platform (PF-7&8) at old malgodam and 1...
×

14213/Vrns Bhrch GD/Gnd
Two no. of washing pit 650-650m length and over head water...
×

14214/Bhrch Vrns GD/Gnd
Construction of rake handling platform at Old Malgodam(New Terminal Station) of...
×

75128/Gnd Grkhpr SUBR/Sbhgpr
Approx all poles are straightened out and source says it is...
×

GD/Gnd
Construction of 2 Nos. of Washing Pit and a Over Headed...
×

05447/Grkhpr Gnd SUBR/Sbhgpr
Gorakhpur- Gonda Express Special At Subhagpur Railway station..RSA With Varanasi- Gorakhpur...
×

11079/Mmb LTT  BNY/Brhn
Nepal Border station Train arrival, departure at Barhni Railway stationVideo link:...
×

GD/Gnd
Enjoy the video of CRS Inspection of Gonda Jn-Subhagpur Rail Electrification.click...
×

SUBR/Sbhgpr
रेल संरक्षा आयुक्त, उत्तर पूर्वी सर्किल द्वारा पूर्वोत्तर रेलवे के लखनऊ...
×

GD/Gnd
CRS Inspection of Gonda Jn-Subhagpur(6KM) Rail Electrification will be held on...
×

15081/Nkh Jngl  SUBR/Sbhgpr
Electrification of 1st phase of Gonda-Gorakhpur Loop line(i.e Gonda Jn to...
×

GD/Gnd
Construction of 2 new platform (PF-7&8) at old malgodam and 1...
×

14213/Vrns Bhrch GD/Gnd
Two no. of washing pit 650-650m length and over head water...
×

75128/Gnd Grkhpr SUBR/Sbhgpr
Approx all poles are straightened out and source says it is...
×

75128/Gnd Grkhpr SUBR/Sbhgpr
Approx all poles are straightened out and source says it is...
×

75128/Gnd Grkhpr GD/Gnd
1- Foundation of Rail Electrification of Gonda...
×

05447/Grkhpr Gnd SUBR/Sbhgpr
Gorakhpur- Gonda Express Special At Subhagpur Railway station..RSA With Varanasi- Gorakhpur...
×

SUBR/Sbhgpr
Energization of Subhagpur (Gonda) - Anand Nagar rail line of (Ner...
×

GD/Gnd
CRS Inspection of Gonda Jn-Subhagpur Rail Electrification has been done and...
×

SUBR/Sbhgpr
रेल संरक्षा आयुक्त, उत्तर पूर्वी सर्किल द्वारा पूर्वोत्तर रेलवे के लखनऊ...
×

22199/Sshsn Exprss GD/Gnd
E-Loco trial done successfully of Gonda-Subhagpur Electrification[1st Phase of Gonda-Gorakhpur Loopline...
×

15081/Nkh Jngl  SUBR/Sbhgpr
Electrification of 1st phase of Gonda-Gorakhpur Loop line(i.e Gonda Jn to...
×

GD/Gnd
Construction of 2 new platform (PF-7&8) at old malgodam and 1...
×

14213/Vrns Bhrch GD/Gnd
Two no. of washing pit 650-650m length and over head water...
×

75128/Gnd Grkhpr SUBR/Sbhgpr
Approx all poles are straightened out and source says it is...
×

GD/Gnd
Construction of 2 Nos. of Washing Pit and a Over Headed...
×

75128/Gnd Grkhpr GD/Gnd
1- Foundation of Rail Electrification of Gonda...
×
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy