Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  

Bangalore Namma Metro - ಸ್ವಲ್ಪ ಜಾಗ ಕೊಡಿ

Full Site Search
  Full Site Search  
 
Fri Jul 19 09:01:46 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Post BlogPost Stn TipUpload Stn PicAdvanced Search
Details Edit
Scenic; Platform Pic; Large Station Board; FOB/Stairs;
Entry# 2208560-0
Details Edit
Medium; Front Entrance - Outside; Large Station Board;
Entry# 2845446-0


CNB/Kanpur Central (10 PFs)
کانپور سینٹرل     कानपुर सेंट्रल

Track: Quadruple Electric-Line

Ghantaghar/Cantt. , KANPUR-208 001
State: Uttar Pradesh

Elevation: 129 m above sea level
Zone: NCR/North Central   Division: Allahabad

Type of Station: Junction
Number of Platforms: 10
Number of Halting Trains: 345
Number of Originating Trains: 40
Number of Terminating Trains: 39
Rating: 3.4/5 (458 votes)
cleanliness - average (63)
porters/escalators - good (57)
food - average (56)
transportation - good (58)
lodging - good (54)
railfanning - good (58)
sightseeing - good (54)
safety - good (58)

Nearby Stations

CPNL/Kanpur C Panel 1 km     CPA/Kanpur Anwarganj 2 km     GOY/Govindpuri Junction 4 km     CPB/Kanpur Bridge Left Bank 4 km     CNBI/Chandari 5 km     RPO/Rawatpur 7 km     CNJW/Holding Line 10 km     MGW/Magarwara 11 km     CHK/Chakeri 12 km     PNK/Panki 12 km    

Station Forum

Page#    Showing 1 to 5 of 2883 blog entries  next>>
  
Poll
0 Followers
4727 views
41 votes
Jun 02 (13:20)   SRC/Santragachi Junction (6 PFs) | SRC/WAP-4/22529

Avishek Ray~   1710 blog posts   28 correct pred (74% accurate)
Entry# 4332981            Tags   Past Edits
#RapidFire (Vote quickly without thinking too much)
Which WAP4 style looks better?
**Pic courtesy : Somanko Tiru (Pic1: SRC WAP4; Pic2: ED WAP4)
**Tagging WAP4 sheds.
NO vote
Pic1. Waist mounted headlamp with smaller windshield (Masculine look)
68%
28
Pic2. Top mounted headlamp with larger windshield (Feminine look)
32%
13

1 Public Posts - Sun Jun 02, 2019

  
1698 views
Jun 02 (14:07)
Avishek Ray~   1710 blog posts   28 correct pred (74% accurate)
Re# 4332981-2            Tags   Past Edits
And what about Airavat?

5 Public Posts - Sun Jun 02, 2019

1 Public Posts - Mon Jun 03, 2019

4 Public Posts - Thu Jun 06, 2019

  
2594 views
Jun 07 (18:31)
Avishek Ray~   1710 blog posts   28 correct pred (74% accurate)
Re# 4332981-13            Tags   Past Edits
Please vote...

  
2476 views
Jun 08 (20:13)
Avishek Ray~   1710 blog posts   28 correct pred (74% accurate)
Re# 4332981-14            Tags   Past Edits
Please vote...
  
General Travel
0 Followers
240 views
Yesterday (15:57)   01475/Pune - Gorakhpur Summer Special | CNB/Kanpur Central (10 PFs)

Ayush Kamal^~   7583 blog posts   82245 correct pred (88% accurate)
Entry# 4381104            Tags   Past Edits
PUNE To KANPUR | Summer Special Train Journey | Part II | Indian Railways click here

  
272 views
Yesterday (16:18)
Ayush Kamal^~   7583 blog posts   82245 correct pred (88% accurate)
Re# 4381104-1            Tags   Past Edits
@ Khandwa.

  
238 views
Yesterday (17:26)
Ayush Kamal^~   7583 blog posts   82245 correct pred (88% accurate)
Re# 4381104-2            Tags   Past Edits
@ Bina.

  
216 views
Yesterday (20:06)
Ayush Kamal^~   7583 blog posts   82245 correct pred (88% accurate)
Re# 4381104-3            Tags   Past Edits
@ Chirgaon.
  
General Travel
Jul 11 (20:34)   NDLS/New Delhi (16 PFs)

India needs 250kmph tracks   43 blog posts
Entry# 4375481            Tags   Past Edits
🙏🙏🙏🙏 INDIA NEEDS HSR🙏🙏🙏🙏
INDIA needs HSR to compete with other World class Railways.
IR is Planning to have HSR(high speed rail above 200kmph) since 1987,but currently IR in 2019 has O kms of HSR.
On the other hand CHINA build it's 1st HSR in 2007 and currently they have 29000 kms of HSR Network.
IR
...
more...
currently has only 1 semi high speed track (160kmph) b/w Delhi-Agra.
IR is Far...Far behind from China OR in Modern Rail Technology.
IR is expanding (Doubling, electrifying,LHBfication) based on 130 kmph technology .But the Future is HSR,LHB(life span 25 yrs) manufactured now Will be in IR upto 2045,means IR will use them till 2045 and this create problem for efficient HSR network in India.
MCF Raebareli is going to manufacture 250kmph Aluminum coaches by 2021, which will be future proof for HSR but these LHBs and Vandebharts can go maximum 200 After doing expensive modifications in them.
Currently, IR is making records in manufacturing LHBs and Vandebharts (160 kmph) and feeling proud,but this is not future, future is HSR.
And we also feel happy by seeing this records and LHBfication.
Some people will say that we don't want HSR but we r comfortable with the conventional rail system if it runs at right time(punctual service).
But,I want to tell them IR can't be punctual because of Old signalling systems & 130 kmph technology.
SNCF submitted detailed project report for Delhi-Chandigarh-Amritsar(450 kms) HSR in 2015-16 projecting cost of 61000 cr Almost half the price of Mumbai-Ahemdabad corridor.This includes 300 kmph capable track, Advance signalling systems and Technology of Rolling stock.
But what happened to this project,we don't know.
Similarly many Routes were proposed but we don't know the progress of work.
In 2009 IR planned to have minimum 4 HRS route of length 2000 kms by 2020 under 'VISION 2020' but its 2019 we didn't see a single track.
HSR plays a very Important role in the development of Economy.so it's very Important us to have a good network of HSR.
I m not saying go directly for 350-380 kmph but IR should go at least for 200kmph.
Some links:
NHSRCL(SPV for implementing Mumbai Ahemdabad corridor)
click here
HSRC(RVNL subsidiary for HSR in India)
click here
IF u want to know more about HSR in India, I am attaching a PDF written by Gaurav Agarwal from RDSO.
Please,let me know your thoughts about HSR in India in the comments below.I wanted to write more but I will post it next time.
I hope you like this blog.
Thanks 😊.

  
2400 views
Jul 12 (20:01)
deependragupta25   95 blog posts
Re# 4375481-1            Tags   Past Edits
Inse electrification and doubling time p nhi hota hsr kha implement krenge. Lik k le lo 2050 tak b agr 2000km ka 350kmph ka track bana de to....Ye railway ka style h
  
Rail Fanning
0 Followers
441 views
Yesterday (12:33)   12368/Vikramshila Express (PT) | SGG/SultanGanj (3 PFs)

Śöñū kümář~   59 blog posts
Entry# 4380828            Tags   Past Edits
12368 vikramshila superfast EXPRESS at sultanganj on pf no 1
  
Rail Fanning
0 Followers
422 views
Jul 17 (19:36)   12815/Nandan Kanan Express (PT) | CNB/Kanpur Central (10 PFs) | MGS/WAP-4/22947

Ayush Kamal^~   7583 blog posts   82245 correct pred (88% accurate)
Entry# 4380334            Tags   Past Edits
NANDAN KANAN Express Departing From KANPUR CENTRAL click here
.
12815 Puri - Anand Vihar Terminal Nandan Kanan Express hauled by MGS WAP-4 22947 departing From Kanpur Central.
Page#    Showing 1 to 5 of 2883 blog entries  next>>

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy