A BIG UPDATE ON MB-GZB ELECTRIFICATION said by DRM MORADABAD through my Twitter query:--
DRM Moradabad @drm_moradabad:----
@tweshrajput Sir, we should have trains with electric traction in December itself after getting CRS clearance .
click here
...
more...
Logon ka kaam hota h kehna...kitti baar soche hue ka ulta hua h...so lets jst kep fingers crossd and wait fr d best...
You are right the section daily serve more than 150 trains up and down means average more than 6 to 7 per hour .And it is an important route for the I R as well as N R.
Haanji ab to bas no halla gulla...bas shanti ke sath souhardya banaye rakho aur kaam dekhte rho kitna hota h.
practical thinking aadmi ko aajkal log negative thinking bolte hai .. so sad..
Bat practical thinking ki nahi approach ki hai while we are dreaming for December , why we should think for six more months . If trains began from December or January , let us dream.
Update on much awaited Moradabad-New Delhi electrification #gzbmbelectrification ...pic taken on 7th June 2015..Gajraula Foot over Bridge Successfully uplifted...d section(Moradabad to Gajraula) is 98% under wires..leaving a small little portion between Moradabad and Lodipur Bishanpur which is just under poles which would be time consuming and very serious task..complete pole structures have been laid on all stations till Gajraula...
Pic.1,2,3,"7"(entering GJL) Gajraula
Pic.4,5 at Amroha
Pic....
more... 6,8 before Amroha
Pic. 9 near Kafurpur
6 mahine zyada nahi ho gaya? i think feb-mar se hi elec engines shuru ho jayenge...
i think first preference wud be to start an EMU to Hapur..and top contenders for long distance elec locos may probably be Lko mail, Lko ac and Shramjeevi..
Yess possibly... emu will be introduced later onn...pehle freight... den trains like lko mail. Lko ac DD will be given eloco....
Via sultanpur 12435/36 ko bsb tak eloco milne se iska time save hoga . Agar gzb mb route bhi special ya vip route me shamil ho jayega .
wo bhi hoga...12435/36 and 12235/36 ka bhi chance hai NDLS-BSB (via SLN) eloco ka...and with BSB-BJU line via Sarnath-Ghazipur-Ballia-Chhapra also identified for electrification, who knows aage tak chal jaaye..waise bhi Katihar outer tak electrification pahunch gaya hai NFR side se..