Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Fri Apr 19 07:27:36 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
What is an LHB coach? What are the differences between LHB coaches and the regular ICF coaches?  
27 Answers
Jul 27 2011 (03:30)
Coach Construction/Seating Arrangements

Entry# 62     
KishorWhoAJE2here~
What is an LHB coach? What are the differences between LHB coaches and the regular ICF coaches?

Social
80474 views
2
Jan 24 2013 (15:13)
Blog Post# 650754-0     
jayateerth kulkarni   Added by: PRABHU~  Jan 24 2013 (15:19)
click here
the real difference between icf coaches & lhb coaches
please add it to faq

78934 views
3
Jul 29 2011 (12:22)
Blog Post# 211934-0     
NazeerCbe^~   Added by: NazeerCbe^~  Aug 02 2011 (07:09)
In February 2000, IR received a consignment of new lightweight all-metal passenger coaches from Alsthom LHB (Germany). The initial units were earmarked for the New Delhi - Amritsar Swarna Shatabdi, but later [5/01] allotted to the new New Delhi - Lucknow Swarna Shatabdi.
The coaches are approximately 2.2m longer than the standard ICF-built integral coaches (two additional rows for the chair cars, one additional sleeping bay for the sleeper coaches). The AC coaches are expected to carry 78 passengers. The body is by Alsthom LHB, with a stainless steel construction, mounted on Fiat bogies with disc brakes. The chair cars are lighter about 10% lighter than the standard IR integral coaches, having a tare weight of 40.3 tonnes.
Improvements
...
more...
for the passengers' comfort include better air flow for the air-conditioning, larger windows, lamps for all seats, and sound insulation. The coaches are also provided with 'anti-climbing' features to reduce casualties in case of collisions. As a move to greater cleanliness at stations, the toilets are designed to allow waste discharge only when the train is in motion.
LHB coaches have an IGBT-based battery charger. The air-conditioned stock uses a 6kW alternator while the non-air-conditioned stock uses a 4.5kW alternator. Air-conditioning equipment is roof-mounted.
These coaches are not compatible with existing designs of ICF/RCF coaches, having two sets of brake and feed pipes and a different electrical coupler, and hence will initially be run in block rakes consisting entirely of the new coaches, until RCF begins producing them with modifications to make them compatible with existing passenger stock.
A total of 24 new coaches are expected to be imported initially (19 second-class AC chair cars, 2 AC chair cars, 3 generator-cum-brake vans), following which a technology transfer arrangement will enable RCF, Kapurthala, to manufacture these models. Later shipments from Alsthom will include composite first-class / AC sleeper coaches, second-class AC sleeper coaches (2-tier and 3-tier), and AC buffet coaches. (See above for some information on the interior arrangements.)
RDSO had the task (starting in June 2000) of developing specifications for all the variant designs of the LHB coaches. In addition to the layout of the compartments and specifications for the passenger accommodations, RDSO also worked on the design for the suspension, alternator drives, and other such details. The design of the General Second Class (GS) coach was done by July 2002, and by 2003 ten variants of the LHB coaches had been designed by RDSO. These include self-generating versions as well as versions powered by end-on generator cars, of air-conditioned first class, 2-tier, and 3-tier coaches, as well as general second class sitting and sleeper coaches.
The speed potential for all the AC variants of the LHB coaches is 160km/h, while the non-AC variants have a speed potential of 120km/h.
Now [2/03] ICF Perambur is also expected to produced these coaches. [1/03] Prototype versions of the AC 3-tier LHB coach have been spotted at New Delhi and are [3/03] undergoing trials on the New Delhi - Kanpur and New Delhi - Moradabad - Lucknow sections. [11/03] The second LHB rake, thought to be meant for the Mumbai Rajdhani, has been spotted around Mumbai (Jogeshwari yard, etc.). Update: [1/05] LHB rakes are used for the Mumbai Rajdhani as well as the August Kranti Rajdhani.
In late 2001 the LHB coaches were taken out of service following a series of incidents where the couplers parted. They were brought back into service on Jan. 1, 2002. Some problems also developed with certain bearings used by these coaches, which were later resolved. Now [3/03] they are expected to also be brought into use for trains other than the Swarna Shatabdis, such as the Mumbai Rajdhani.
Comparison of ICF and LHB coaching stock -- passenger carrying capacity
EOG = Coach needs power from end-on generator car; SG = self-generating.Type Passengers - ICF Passengers - LHB
AC-1 (EOG) 18 24
AC-2 (EOG) 46 54
AC-3 (EOG) 64 72
AC-1 (SG) 18 24
AC-2 (SG) 46 54
AC-3 (SG) 64 72
SCN (SG) 72 78
GS (SG) 90 99
SLR 24 36

80917 views
1
Jul 13 2011 (11:06)
Blog Post# 203956-20     
D Pravin   Added by: moderator^~  Aug 02 2011 (07:09)
@D Pravin
The cost of each LHB coach is about Rs 1.5 crore to 2 crore. Where the cost of each locomotive is about Rs 3 crore.
#
LHB coaches are anti-telescopic and cannot turn turtle in the event of any derailment or collision.
#
...
more...

LHB coaches have more riding comforts due to improved suspension system.
#
The LHB coaches are fitted with microprocessor controlled high capacity air conditioning system, which gives passengers better comforts during summer and winter season.
#
Dwelling at length on its super-quality and design structure, the Railway Board official said that the sound level of LHB coaches is hardly 60 decibels while it is about 100 decibels in conventional coaches.
#
The disc brake system of LHB coaches is superior to that of conventionally used thread brake system. Besides, the Fiat technology used in LHB coaches is both heat and cold resistant. The new technology consumes less energy while creating heat and cooling effect in these new coaches.
#
The controlled discharge toilet system (CDTS) in LHB coaches is an added advantage with them. The windows are wider and each coach has a pantry provision.

81601 views
1
May 16 2011 (00:03)
Blog Post# 161684-2     
Guest: 795c4934   Added by: moderator^~  Aug 02 2011 (07:09)
To minimise casualties after derailments, the Railways are contemplating switching over from indigenous ICF coaches to German technology based LHB coaches in all mail and express trains as a safety measure.
LHB (Linke Holfmann Bush) coaches made of stainless steel have more inbuilt safety features as they can absorb shock and impact of derailment more effectively and as a result do not topple, thus reducing the loss of lives in case of accident,
LHB coaches manufactured in the Rail Coach Factory in Kapurthala are mostly used in Rajdhani and Shatabdi trains.
jayashree
...
more...
shah

82591 views
0
Mar 28 2011 (15:25)
Blog Post# 130528-1     
Manish   Added by: moderator^~  Jul 27 2011 (07:02)
There is shortage of LHB rakes now.

82280 views
0
Mar 28 2011 (15:35)
Blog Post# 130528-2     
kyakarun   Added by: moderator^~  Jul 27 2011 (07:02)
why LHB coaches in a different color??

82129 views
0
Mar 28 2011 (16:07)
Blog Post# 130528-3     
kyakarun   Added by: moderator^~  Jul 27 2011 (07:02)
again Mumbai LTT-Gorakhpur Super Fast Express with LHB coaches now here u will find one of the coach is having red color painted gate.iz it a mistake of IR or IR waz in a shortage of color??

81897 views
0
Mar 28 2011 (19:37)
Blog Post# 130528-4     
Guest: 3e4465d6   Added by: moderator^~  Jul 27 2011 (07:02)

Surprising how come Mamta's location "SER" did not have LHB for Coromandel ?

81823 views
0
Mar 28 2011 (20:16)
Blog Post# 130528-5     
Anonymous1218~   Added by: moderator^~  Jul 27 2011 (07:02)
Not oly Coromandel Expres, there are many legendry superfast train which have ti b upgraded!!!
n LHB's r in shortage!!!

81559 views
0
Mar 31 2011 (21:12)
Blog Post# 130528-6     
Guest: 3e4465d6   Added by: moderator^~  Jul 27 2011 (07:02)

What a joke ? Shortage of rakes should not apply for ER and SER . Those are the regions of our great RM , when she gave a bunch of trains to WB how come she compromised on the rakes , any ways really funny .

81791 views
0
Apr 07 2011 (15:25)
Blog Post# 130528-10     
Guest: 795d062a   Added by: moderator^~  Jul 27 2011 (07:02)
If this train gets LHB coaches, will the capacity of sleeper class will increase ???

83042 views
0
Apr 07 2011 (15:26)
Blog Post# 130528-11     
Guest: 7db8abdb   Added by: moderator^~  Jul 27 2011 (07:02)
what is the meaning of LHB??? pls sum1 tell me

82610 views
2
Apr 07 2011 (15:48)
Blog Post# 130528-12     
Guest: 3e4465d6   Added by: moderator^~  Jul 28 2011 (04:44)

Linke Holfmann Bush (LHB) coaches , the German technology. LHB coaches are superior to conventional coaches and could run at the maximum speed of 160 to 200 kmph . LHB coaches are anti-telescopic and cannot turn turtle in the event of any derailment or collision . LHB coaches have more riding comforts due to improved suspension system. The LHB coaches are fitted with microprocessor controlled high capacity air conditioning system, which gives passengers better comforts during summer and winter season. That apart, these coaches have capacity to accommodate about 72 passengers in each AC-3 coach as against 64 passengers in other AC-3 conventional coach and 80 berths in SL against 72 in conventional coaches . Dwelling at length on its
...
more...
super-quality and design structure, the Railway Board official said that the sound level of LHB coaches is hardly 60 decibels while it is about 100 decibels in conventional coaches. The disc brake system of LHB coaches is superior to that of conventionally used thread brake system. Besides, the Fiat technology used in LHB coaches is both heat and cold resistant. The new technology consumes less energy while creating heat and cooling effect in these new coaches

82346 views
0
Apr 07 2011 (15:55)
Blog Post# 130528-13     
Guest: 795d062a   Added by: moderator^~  Jul 27 2011 (07:02)

So 8 seats in each in sleeper and 3 rd AC will increase that means....
If Coromandal express got LHB then over 150 extra seats will be added.

83885 views
0
Apr 07 2011 (16:01)
Blog Post# 130528-14     
Guest: 3e4465d6   Added by: moderator^~  Jul 27 2011 (07:02)

Exactly and since the coaches have a speed capacity of up to 200kmph hence less travelling time .

83197 views
0
Apr 07 2011 (16:20)
Blog Post# 130528-15     
MatsyagandhaSFExpress~   Added by: moderator^~  Jul 27 2011 (07:02)
which are other m/e or superfast trains having LHB coaches

82646 views
0
Apr 07 2011 (16:22)
Blog Post# 130528-16     
Manish   Added by: moderator^~  Jul 27 2011 (07:02)
LTT- Gorakhpur Express

83220 views
0
Apr 07 2011 (18:20)
Blog Post# 130528-17     
MatsyagandhaSFExpress~   Added by: moderator^~  Jul 27 2011 (07:02)
other than that

83517 views
0
Apr 07 2011 (18:34)
Blog Post# 130528-18     
Manish   Added by: moderator^~  Jul 27 2011 (07:02)
No other train as far as I know.

80914 views
0
Aug 18 2010 (19:07)
Blog Post# 64963-7     
Nisheeth   Added by: moderator^~  Aug 02 2011 (07:09)
This is company name LHB is Linke-Hoffmann-Busch

81299 views
0
Aug 18 2010 (19:09)
Blog Post# 64963-8     
Guest: 7e49b9be   Added by: moderator^~  Aug 02 2011 (07:09)
thnks sirji, but what is so great, means what does it do.......

81372 views
0
Aug 18 2010 (19:10)
Blog Post# 64963-9     
Nisheeth   Added by: moderator^~  Aug 02 2011 (07:09)
The company was started by the first gentleman Mr. Linke in Breslau Poland way back in late 1800. After many fusions, mergers and joint venture agreements the company now belongs to Alstom group.
These LHB coaches are fireproof ones designed by Alsthom Motors of Germany.
It was introduced after the fire incident in the Golden Temple Mail towards Amritsar.

81317 views
0
Aug 18 2010 (19:16)
Blog Post# 64963-11     
KRISHNA PRASAD   Added by: moderator^~  Aug 02 2011 (07:09)
Linke Holfmann Bush-LHB coaches are the new type of coaches manufactured by RCF mainly to ensure more saftey-anti-derailment, speed, and accurate perfomance. These coaches are anti telescopic too. Now used only in Rajdhani, Shadabdi and Duranto, will extend to all main trains in future.

81417 views
0
Aug 18 2010 (19:17)
Blog Post# 64963-12     
Nisheeth   Added by: moderator^~  Aug 02 2011 (07:09)
LHB Coaches are available at present in sum Rajdhani, Shatabdi, Duranto & Garib Rath
Thanks with regd.

81012 views
0
Aug 18 2010 (19:19)
Blog Post# 64963-13     
KRISHNA PRASAD   Added by: moderator^~  Aug 02 2011 (07:09)
Which Garib Rath has LHB coaches?

83576 views
0
Mar 21 2010 (00:22)
Blog Post# 25466-3     
Guest: 7fc2e8f9   Added by: moderator^~  Aug 02 2011 (07:09)
@saragada ramesh: Re# 25466-2
LHB Coaches mean the coaches made of steel by RCF, Kapurthala previously built and imported from Linke-Hoffman-Bosch. These coaches have large windows, are fire-proof, sound resistant and jerk free. They are being used in trains like HWH RAJ EXP, SDAH-NDLS DURONTO EXP and ASR-NDLS SHATABDI EXP.
Regards,
Rohit.

83038 views
1
Mar 21 2010 (00:24)
Blog Post# 25466-4     
Guest: 564021fb   Added by: moderator^~  Aug 02 2011 (07:09)
@saragada ramesh: Re# 25466-2
LHB coaches are the new style rail coaches made by the LHB division of the French company Alstom. (I think it is a collaboration between RCF Kapurthala India & Alstom LHB) "LHB" is just the name of the company that designed the new style coaches - it does not mean anything else. I am attaching a youtube video of LHB coaches used in Rajdhani. many other videos are also available on youtube.
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy