Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Fri Apr 19 07:30:43 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 5038077
Posted: Aug 10 2021 (11:35)

1 Responses
Last Response: Aug 30 2021 (21:40)
General Travel
25649 views
0

Aug 10 2021 (11:35)   52963/Dr. Ambedkar Nagar - Omkareshwar Road MG Passenger (UnReserved) | DADN/Dr. Ambedkar Nagar (Mhow) (3 PFs)
SonOfGalaxy
SonOfGalaxy   179 blog posts
Entry# 5038077            Tags   Past Edits
Update on Mhow Sanawad GC Project:


Total length - 472.64 km + 22.96 km ( Through material modification for Fatehabad-Chandravatiganj- Ujjain). Western railway- 298.64 km+ 22.96 km South central railway-174.00 km Railway wise progress is as under:- Western Railway :- Sections Commissioned-
(i)
...
more...
Dhoswas- Ratlam- Indore-Rau-Mhow– 147.70 KM (ii) Nimarkhedi- Mathela - 45.61 Km.
(iii) Sanawad-Nimarkhedi (11.6 Km)-CRS inspection done on 31.03.2021.
(iv) Fathabad-Ujjain (22.96 Km) –CRS inspection done on 11.02.2021.


Work in progress:-
i) Khandwa Bye Pass cabin to Khandwa (5.00 Km) –Tender for balance work awarded. Work is under progress.
ii) Rau-Mhow doubling (9.50 km ) – Tendering work in progress.


Mhow- Sanawad (84.65 Km ) : Detailed estimate sanctioned by Railway Board vide letter No. 93/W-I/GC/W/12/RTM-MHOW-Part-5 Dtd 05.07.19. Total 208.9 Hect. Forest land and 58.131 Hect.revenue land needs to be acquired. Demand note of Rs 34.12 Cr for forest land and Rs 14.98 Cr for revenue land is received. Land acquisition is under process.

1) Sanawad-Muktiyarbalwada- (26.10 km) The tender for Muktiya Balwada to Sanawad 26.10 Kms are to be done on EPC modules. Work is to be planned on EPC Module. Tender document under preparation.

2) Mhow- MuktiyaBalwada- (58.55 kms) Mhow- Mukhtiara section (58.65km), which will involve grade revision of 1:150 instead of 1:100 will be finalized after finalization of alignment and land acquisition 3) FLS quotation has been done and alignment work with 1 in 150 ruling gradient is in progress.

South Central Railway:-
1.Akola-Akot (43.50 Km) - commissioned.

2.Akot-Amalakhurd (77.43 Km) - Alignment is passing through Melghat tiger Reserve. Detailed Estimate sanctioned for carrying out GC on same alignment. But Forest and wild life clearances not received from Forest department. Work not started.

3. Amalkhurd - Khandwa (54.50 Km). - Work in progress. The track is passing through Reserved forest from Km 644.80 to km.619.80 between Gurhi-Amalakhurd stations. Revised on line application for diversion of forest land of 21.446 HA is submitted to Forest department on 26.05.2021. TDC : March 2023.

Fore more:
click here

Translate to English
Translate to Hindi

17981 views
0

Aug 30 2021 (21:40)guest
Re# 5038077-1              
Ye 2026 tak complete hoga...
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

2037976 ★★★ 65ELSG^~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy