Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark mode
 
Tue Apr 16 17:17:22 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 4886980
Posted: Feb 24 2021 (08:59)

3 Responses
Last Response: Feb 25 2021 (11:51)
Rail News
102965 views
1

Commentary/Human Interest
ECR/East Central
Feb 24 2021 (08:59)   जुलाई तक हो जायेगा पाटलिपुत्र-पहलेजा लाइन का दोहरीकरण, दो नये प्लेटफॉर्म बनने के बाद पाटलिपुत्र स्टेशन पर बढ़ेंगी ट्रेनें

Anupam Enosh Sarkar^~   27783 news posts
Entry# 4886980   News Entry# 440591         Tags   Past Edits
प्रमोद झा, पटना. पाटलिपुत्र स्टेशन पर दो नये प्लेटफॉर्म के बनने से ट्रेनों की संख्या की कमी दूर होगी. अब तीन से पांच प्लेटफॉर्म होने...

79410 views
1

Feb 25 2021 (11:35)
FraudsterConman
FraudsterConman   7672 blog posts
Re# 4886980-2              
Pramod Jha, Patna. There will be no shortage of trains due to the creation of two new platforms at Pataliputra station. Now, due to increase in the number of trains due to having three to five platforms, connectivity of capital Patna with North Bihar will increase. The facility will be increased to run more trains than before in other places including North Bihar. A new platform is being built between platform number one and two at Pataliputra station. Construction of two new platforms is going on fast. It is expected to be completed by July. With this, the foot over bridge is being constructed on the north side of Digha end of the station. This too will be completed by the said period. Due to its construction, passengers coming to Pataliputra station will be able to move from one platform to another. Right now the presence of more than one train...
more...
at the station due to the sole foot over bridge keeps the pressure of the passengers. Plans are on to develop Pataliputra station as a model station.
Construction work going on fast: - Double rail line work is being done between Pataliputra station to Paheleja. The work of completing the double rail line on JP Setu will also be done by December of this year. Therefore, two new platforms are being prepared after three already prepared platforms. The base of the platform is ready. Rapid work is being done to prepare the platform by June-July. After this, the number of trains will increase. With this, the convenience of passengers will increase as the speed of trains increases.
Construction will be done by June-July: - ECR KCPRO Rajesh Kumar said that new platform and foot over bridge will be constructed by June-July. With this, the facility will increase for the passengers. With the increase in the number of trains, connectivity with Patna, the capital of North Bihar, will increase further. The number of trains will also increase in this route.

Translate to English
Translate to Hindi
Show AI Response

2 Public Posts - Thu Feb 25, 2021

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

5999579  10arishabh1819~
4317553 ★★★ 268AvishekRay~
5187671 ★★★ 148Jordan~
4466128 ★★★ 102AvishekRay~
4967377  19RohitBiharSharif~

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy