The bridge over Ahiran feeder cancel will take time. Their scheduled target was to complete by March 2022. The construction of bridge started 7-8 months back only and paused since lockdown. So expected that this will take more time than scheduled timeline.
This is the only blocker for full double line between Azimganj-Farakka section.