Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Sat Apr 20 03:30:54 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 4599359
Posted: Mar 21 2020 (19:34)

No Responses Yet
Info Update
24450 views
1

Mar 21 2020 (19:34)  
ForeverRailfan^~
ForeverRailfan^~   52688 blog posts
Entry# 4599359              
DUTIES OF DIVISIONAL OFFICERS & STAFF IN CHARGE OF P. WAY
-------------------------------
1 Duties of incharge SSE/SE/JE (P. Way)
i) SSE/SE (P. Way) incharge of the section is responsible for pre-block operations, Block operations (other than machine operation) and Post-Block Operations as detailed for various machines in Chapter 3.
ii)
...
more...
After closing of the work by track machines, checking the condition of track and attending to any short-comings manually and ensuring that the track parameters are well within the safety tolerance and free of obstructions/infringements for safe passage of traffic before clearing the line block will be the responsibility of the SSE/SE/JE (P. Way) who works with the machine, including imposition of suitable speed restrictions, if necessary based on the condition of the track after machine working.
iii) The issue of revised caution orders and modifications to the location and extent of speed restrictions and providing shifting of various engineering indicators to suit the progress of work at the end of each day will be the responsibility of the SSE/SE/JE (P. Way) working with the machine.
iv) Transportation of tamping tools to be reconditioned and bringing back reconditioned tamping tools will be his responsibility. Similarly, he will be responsible for temporary storage and timely transportation of diesel oil, Lub Oil, Hydraulic Oil and other consumables from the Depots to various machines working in his jurisdiction.
v) He should make available the details of precise track geometry data for working of the tampers in design mode.
vi) He shall ensure the quality of work done by the machine and if the quality is not satisfactory he along with machine operator shall investigate and take suitable remedial measures.
vii) He is responsible for protection of the site of work and adjoining track wherever necessary. He will be responsible for arranging adequate precautionary measures for the safety of staff working with the machine in the block section against danger of trains on the adjoining line(s).
viii) He is responsible to ensure that the machine(s) are stabled in suitable sidings and at such stations as to minimising idle run of the machines as well as wastage of block hours in entering and clearing of the block section.
ix) He is responsible for clearing of the block section in case failure of the track machines in mid-section, duly calling for necessary assistance of light engine, breakdown special etc. as necessary.
x) He shall arrange for protecting and watching of stabled machines and to ensure that no sick vehicles etc, are pushed into the same siding affecting the taking out of the machines to avail blocks.
(xi) He shall co-ordinate with other departments like Traffic, OHE and S&T in the field to facilitate working.
-------------------------------
2] Duties of Assistant Engineer (Open Line)
i) He shall arrange for suitable accommodation for machine staff wherever camping coaches are not provided or are inadequate, with the facility of water supply, power supply and resting arrangement.
ii) He shall periodically inspect track machines working in his jurisdiction as specified in Chapter 5.
iii) He shall arrange for transportation of consumables, spares etc., required by the machines from the Depots to site of work.
iv) He shall ensure adequate lighting arraignments where night working by Machines are involved.
v) He monitor output and quality of work done by the machines.
vi) He shall co-ordinate with other departments like Traffic, OHE and S&T in the field to facilitate machine working.
-------------------------------
3] Duties of Sr. DEN/DEN
i) Sr. Divisional Engineer/Divisional Engineer is responsible for sending the Annual requirement plan for track machines to Headquarters and to initiate all preliminary works on receipt of Draft Deployment Plan from HQ and for timely completion of all preparatory works for operation of machines as per approved deployment programme as detailed in Para 5.1.1.
ii) He shall ensure that the prerequisites for introduction of various track machines as specified in Chapter 5 are complied with, well in advance of deployment of the machine.
iii) Wherever the frequency of tamping is more than the prescribed tamping cycle, necessary action should be taken by him to improve the track structure and to eliminate the causes leading to such more frequent tamping.
iv) He shall make arrangements for adequate external lighting when night working is involved.
v) He shall make arrangements for pre-block, during block and post-block working duly fixing agencies wherever required.
vi) He shall ensure that detailed MOUs for day to-day working are issued jointly with Sr. Divisional Operating Manager at Divisional level based on MOUs issued by the Headquarters.
vii) He shall plan necessary works for providing favourable cross-overs and sidings for berthing of machines wherever necessary.He should also ensure that arrangements are made for adequate lightening and water supply at such sidings.
viii) He shall ensure that machines are utilised in continuous stretches as per planned programme avoiding frequent shifting of the machines.
ix) During inspection of the machine working at site, he shall see the safety aspects of staff against danger of incoming trains on adjacent line(s).

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy