Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  

patri ke is taraf ya us taraf, zindagi mein hum sab RailFan ek taraf - Ananya D'Souza

Full Site Search
  Full Site Search  
 
Thu Apr 2 01:14:35 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Stream
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Post BlogPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 4599359
Posted: Mar 21 (19:34)

No Responses Yet
  
Info Update
0 Followers
1658 views
Mar 21 (19:34)  

Forever Railfan^~   24450 blog posts   13171 correct pred (63% accurate)
Entry# 4599359            Tags   Past Edits
DUTIES OF DIVISIONAL OFFICERS & STAFF IN CHARGE OF P. WAY
-------------------------------
1 Duties of incharge SSE/SE/JE (P. Way)
i) SSE/SE (P. Way) incharge of the section is responsible for pre-block operations, Block operations (other than machine operation) and Post-Block Operations as detailed for various machines in Chapter 3.
ii)
...
more...
After closing of the work by track machines, checking the condition of track and attending to any short-comings manually and ensuring that the track parameters are well within the safety tolerance and free of obstructions/infringements for safe passage of traffic before clearing the line block will be the responsibility of the SSE/SE/JE (P. Way) who works with the machine, including imposition of suitable speed restrictions, if necessary based on the condition of the track after machine working.
iii) The issue of revised caution orders and modifications to the location and extent of speed restrictions and providing shifting of various engineering indicators to suit the progress of work at the end of each day will be the responsibility of the SSE/SE/JE (P. Way) working with the machine.
iv) Transportation of tamping tools to be reconditioned and bringing back reconditioned tamping tools will be his responsibility. Similarly, he will be responsible for temporary storage and timely transportation of diesel oil, Lub Oil, Hydraulic Oil and other consumables from the Depots to various machines working in his jurisdiction.
v) He should make available the details of precise track geometry data for working of the tampers in design mode.
vi) He shall ensure the quality of work done by the machine and if the quality is not satisfactory he along with machine operator shall investigate and take suitable remedial measures.
vii) He is responsible for protection of the site of work and adjoining track wherever necessary. He will be responsible for arranging adequate precautionary measures for the safety of staff working with the machine in the block section against danger of trains on the adjoining line(s).
viii) He is responsible to ensure that the machine(s) are stabled in suitable sidings and at such stations as to minimising idle run of the machines as well as wastage of block hours in entering and clearing of the block section.
ix) He is responsible for clearing of the block section in case failure of the track machines in mid-section, duly calling for necessary assistance of light engine, breakdown special etc. as necessary.
x) He shall arrange for protecting and watching of stabled machines and to ensure that no sick vehicles etc, are pushed into the same siding affecting the taking out of the machines to avail blocks.
(xi) He shall co-ordinate with other departments like Traffic, OHE and S&T in the field to facilitate working.
-------------------------------
2] Duties of Assistant Engineer (Open Line)
i) He shall arrange for suitable accommodation for machine staff wherever camping coaches are not provided or are inadequate, with the facility of water supply, power supply and resting arrangement.
ii) He shall periodically inspect track machines working in his jurisdiction as specified in Chapter 5.
iii) He shall arrange for transportation of consumables, spares etc., required by the machines from the Depots to site of work.
iv) He shall ensure adequate lighting arraignments where night working by Machines are involved.
v) He monitor output and quality of work done by the machines.
vi) He shall co-ordinate with other departments like Traffic, OHE and S&T in the field to facilitate machine working.
-------------------------------
3] Duties of Sr. DEN/DEN
i) Sr. Divisional Engineer/Divisional Engineer is responsible for sending the Annual requirement plan for track machines to Headquarters and to initiate all preliminary works on receipt of Draft Deployment Plan from HQ and for timely completion of all preparatory works for operation of machines as per approved deployment programme as detailed in Para 5.1.1.
ii) He shall ensure that the prerequisites for introduction of various track machines as specified in Chapter 5 are complied with, well in advance of deployment of the machine.
iii) Wherever the frequency of tamping is more than the prescribed tamping cycle, necessary action should be taken by him to improve the track structure and to eliminate the causes leading to such more frequent tamping.
iv) He shall make arrangements for adequate external lighting when night working is involved.
v) He shall make arrangements for pre-block, during block and post-block working duly fixing agencies wherever required.
vi) He shall ensure that detailed MOUs for day to-day working are issued jointly with Sr. Divisional Operating Manager at Divisional level based on MOUs issued by the Headquarters.
vii) He shall plan necessary works for providing favourable cross-overs and sidings for berthing of machines wherever necessary.He should also ensure that arrangements are made for adequate lightening and water supply at such sidings.
viii) He shall ensure that machines are utilised in continuous stretches as per planned programme avoiding frequent shifting of the machines.
ix) During inspection of the machine working at site, he shall see the safety aspects of staff against danger of incoming trains on adjacent line(s).

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Apr 12
Trains with ARP 15 Dep on: Fri Apr 17
Trains with ARP 30 Dep on: Sat May 2
Trains with ARP 120 Dep on: Fri Jul 31

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4246530
    Mar 02 2019 (12:59AM)


    @all: Regarding the new SCoR zone, our VSKP and other SCoR members are excited and interested to change the train/station zones. We may let them go ahead with it. This piece of info is NOT critical for trains and TTs which would affect regular passengers - so it's FINE. . We may let them...
  • Entry# 4239625
    Feb 22 2019 (10:22PM)


    @all: This is a repeat warning to all that: Anonymous posting may NOT be used to directly address regular members -> like scolding them, commenting about their blogging habits, arguing with them, or ANY other personal comment/remark against any other member, EVEN if it is not offensive. ANY personal remark (even if not...
  • Entry# 4214881
    Feb 01 2019 (07:45PM)


    This is an advance notice of the last and CORE feature of the RailFan app - Trips/Spottings - which will be enabled next week. A week after that, RailFan will go into Open Beta, whereby all members will be able to download the app without providing their email. . The Trip/Spotting feature of...
  • Entry# 4213057
    Jan 31 2019 (05:45AM)


    A few small enhancements will be made to the site in the coming days, regarding Member profiles. . 1. Hereafter, we shall require REAL permanent names of members. Members will have the option of reporting those whose name is fake or not real. An SW will be issued, whereupon the member will have...
  • Entry# 4205675
    Jan 23 2019 (08:11PM)


    This is an advance notice of a small enhancement to the Forum. Within a couple of days, we shall introduce "anonymous posting" for Blogs and Trips. With "anonymous posting", members will still be required to login to your account and abide by all Forum guidelines, but your name will be hidden...
  • Entry# 4200970
    Jan 18 2019 (10:12PM)


    @all: This is to formally announce the END of the RailCal app. Due to the information blockade, the app has lost its value, and has been rendered completely useless. We are unable to support RailCal anymore. Sorry to disappoint our users. . RailCal has already been taken off the Google PlayStore. So once...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy