Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Apr 25 18:03:29 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 4370248
Posted: Jul 05 2019 (12:31)

18 Responses
Last Response: Jul 07 2019 (09:30)
Rail News
76455 views
5

New Facilities/Technology
KR/Konkan
Jul 05 2019 (12:30)   Modernisation of Konkan Railway to boost tourism

Reva18~   4104 news posts
Entry# 4370248   News Entry# 386041         Tags   Past Edits
Margao: Part doubling of the Konkan Railway route, setting up of new stations, route electrification and other capacity enhancement works that are under way, will boost...

13 Posts

46809 views
1

Jul 06 2019 (15:40)
LHB_for_18047~
LHB_for_18047~   10600 blog posts
Re# 4370248-14              
MAO SVM and SVM QLM doubling works are going at great pace might get completed by Q2 or Q3 of 2021 if continues at same pace.
Regarding Majorda Vasco I had read somewhere on internet it was stuck due to some land acquisition around Vasco outers areas ie. as per a SWR official he did not mention objections at Majorda and Cansaulim.
There are some houses on the hills at VSG outers which needs to be destroyed so those people will have to be reallocated to other areas as compensation that
...
more...
is the reason the official cited. Now regarding those houses and their residents most of the people residing in those houses are not Goan natives they are Non Goans. Now see the fun those who oppose doubling in the name of environment and heritage buildings are the same people who want to throw those outsiders Non Goans out of Goa.
Regarding the heritage buildings those are only located in between Majorda to Cansaulim around 5 kms and I don't think for laying new tracks those buildings will have to be demolished. These people are simply anti-establishment kind of.
Also who cares of the Portuguese heritage the same Portuguese who murdered thousands of Goans in the name of religion ?
I'm a native Goan and can clearly tell you the only obstruction for Majorda Vasco doubling is the reallocation of the people at VSG outers whose houses will be gone.

Translate to English
Translate to Hindi

47162 views
0

Jul 06 2019 (20:33)
KT_Railfan^~
KT_Railfan^~   2013 blog posts
Re# 4370248-15              
Is there enough space at Dabolim stn ? If yes, while Doubling SWR should seriously think of shifting MPT Main lines/Freight lines from Vasco stn. to Dabolim area. In that way additional Infrastructure for Passenger traffic can be utilised.
-
By the way, there is some land besides Vasco stn ( mostly south), near that school. Who owns that land any idea ?
Translate to English
Translate to Hindi

46702 views
1

Jul 06 2019 (22:03)
LHB_for_18047~
LHB_for_18047~   10600 blog posts
Re# 4370248-16              
Dabolim there is not much scope. I think they are planning on laying some stabling lines at Chandor Railway station. There was a BTPN terminal at VSG on the tracks branching towards MPT demolished now also a BCNA loading was there. The tracks branching towards MPT there is scope to develop two to three stabling lines.
Translate to English
Translate to Hindi

47633 views
1

Jul 06 2019 (22:10)
BRCWAP7~
BRCWAP7~   13281 blog posts
Re# 4370248-17              
Konkan Railway Electrification .
@Ratnagiri
Translate to English
Translate to Hindi

46993 views
0

Jul 07 2019 (09:30)
A2Z~
A2Z~   17505 blog posts
Re# 4370248-18              
- doubling project of Konkan Railway was initiated by the then RM Mr. Prabhu.
- However, there were confusing reports in past regarding the project
- It was reported that Mr. Prabhu wanted to go for full stretch doubling of KR at cost of 10000-15000 Cr. Rs.
- Later it was reported that doubling shall be done in 3 patches i.e. from Roha
...
more...
& Mangalore (Manglore-Udupi)ends, in addition to small stretch in Goa sector.
- Finally work could start from Roha to Veer (47 kms) which is likely to be completed in a year or two. Work from southern end/ Goa sector has probably not started yet. It was reported that work from Veer to Chiplun (81 kms) shall also be taken up.
- With departure of Mr Prabhu from Rly Ministry, KR doubling is no longer a priority. However, electrification is going on briskly, in line with IR policy to electrify all BG routes in coming few years.

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy