Trial for Kolkata East-West Metro is in full swing. A portion (Saltlake Sector 5 to Saltlake Stadium) is expected to open in the current month of June. Once the entire route is open, then it will be an extremely useful connection in between SRC and Saltlake via HWH and SDAH. A branch has also been planned to extend till Kolkata Airport.