Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Apr 18 17:22:56 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 4271521
Posted: Mar 25 2019 (19:50)

31 Responses
Last Response: Jun 27 2019 (07:09)
2 Followers
Info Update
55161 views
11

Mar 25 2019 (19:50)   16352/Nagercoil - Mumbai CSMT Express (via Renigunta) (PT) | KWV/Kurduwadi Junction (4 PFs)
psanga_sur^~
psanga_sur^~   5601 blog posts
Entry# 4271521            Tags   Past Edits
#PuneSolapurDoubling
While traveling in 16352 Nagarcoil - Tirupati - Mumbai Express, I have observed following progress of doubling.
Wadshinge - Interlocking work for UP main line is already completed new signals are ready for functioning.
Kurduwadi - Wadshinge to Kurduwadi outer track laid long back. Now the progress is KWV outer to KWV Junction new tracks are laid.
Major
...
more...
interlocking work is yet to be done, but all necessary tracks are laid.
So after doubling, line passing from PF 2 of KWV will be treated as UP Main line.
At present this line goes towards PVR/MRJ, therefore new track laid from KWV LC to KWV Pune end outer at extreme left side.
So this new line will goes towards PVR/MRJ after interlocking and existing PVR/MRJ line will be connected to new line towards Dhavlas from KWV outer. Here also new signaling system is installed and ready for testing.
(At present, construction of new platform beside PF 1 for 24 coaches trains will not be happening, so they will use PF 3 & 4 as usual).
Dhavlas - Construction of new platform is 80% completed. Tracks already laid in entire stretch.
Only interlocking work is remaining.
Kem - Bridge work at Kem outer is completed and PF 1 is closed for constructing new up main line adjucent to it.
Bhalawani - Here also platform work is 80% completed. Entire stretch from Wadshinge is ready for CRS after interlocking work.
After Bhalawani I haven't seen much progress, only leveling work is going on.

Translate to English
Translate to Hindi

28 Posts

11157 views
0

Jun 19 2019 (20:22)
Chinmay15~
Chinmay15~   2475 blog posts
Re# 4271521-29              
Is their any news for Vadshinge Bhalvani block?
Translate to English
Translate to Hindi

10833 views
0

Jun 19 2019 (20:56)
psanga_sur^~
psanga_sur^~   5601 blog posts
Re# 4271521-30              
No news yet
Translate to English
Translate to Hindi

10489 views
0

Jun 23 2019 (13:46)
psanga_sur^~
psanga_sur^~   5601 blog posts
Re# 4271521-31              
RB rejected SUR Division proposal of block for interlocking as RUB at KWV is not ready.
/blog/post/4349878
Translate to English
Translate to Hindi

10068 views
1

Jun 26 2019 (22:48)
axn_kapil
axn_kapil   342 blog posts
Re# 4271521-32              
see Dhananja Hunasgi’s latest doubling status video then it seems there is no much work done, from Bhigwan to Washimbe still incomplete leveling work is seen, same as six month old video...
Translate to English
Translate to Hindi

9912 views
0

Jun 27 2019 (07:09)
axn_kapil
axn_kapil   342 blog posts
Re# 4271521-33              
Pune miraj started last year only but it seems they are well ahead, electrification also started, bhigwan mohol doubling will take another 5 years to complete doubling and further 5 years for electrification.
“Jab RG PM banega tabhi bhigwan mohol doubling complete hoga” LOL
Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Leading Polls

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy