Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  

Gatimaan Express: Raftaar meri Pehchaan - Sajid Akhtar

Full Site Search
  Full Site Search  
 
Sat May 25 05:20:32 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Post BlogPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 4271521
Posted: Mar 25 (19:50)

26 Responses
Last Response: May 13 (15:45)
  
Info Update
2 Followers
8447 views
Mar 25 (19:50)   16352/Nagercoil - Mumbai CSMT Balaji Express (PT) | KWV/Kurduvadi Junction (4 PFs)

Solapur Superfast^~   3194 blog posts   74 correct pred (74% accurate)
Entry# 4271521            Tags   Past Edits
#PuneSolapurDoubling
While traveling in 16352 Nagarcoil - Tirupati - Mumbai Express, I have observed following progress of doubling.
Wadshinge - Interlocking work for UP main line is already completed new signals are ready for functioning.
Kurduwadi - Wadshinge to Kurduwadi outer track laid long back. Now the progress is KWV outer to KWV Junction new tracks are laid.
Major
...
more...
interlocking work is yet to be done, but all necessary tracks are laid.
So after doubling, line passing from PF 2 of KWV will be treated as UP Main line.
At present this line goes towards PVR/MRJ, therefore new track laid from KWV LC to KWV Pune end outer at extreme left side.
So this new line will goes towards PVR/MRJ after interlocking and existing PVR/MRJ line will be connected to new line towards Dhavlas from KWV outer. Here also new signaling system is installed and ready for testing.
(At present, construction of new platform beside PF 1 for 24 coaches trains will not be happening, so they will use PF 3 & 4 as usual).
Dhavlas - Construction of new platform is 80% completed. Tracks already laid in entire stretch.
Only interlocking work is remaining.
Kem - Bridge work at Kem outer is completed and PF 1 is closed for constructing new up main line adjucent to it.
Bhalawani - Here also platform work is 80% completed. Entire stretch from Wadshinge is ready for CRS after interlocking work.
After Bhalawani I haven't seen much progress, only leveling work is going on.

3 Public Posts - Tue Mar 26, 2019

1 Public Posts - Wed Mar 27, 2019

2 Public Posts - Sat Apr 06, 2019

1 Public Posts - Sun Apr 07, 2019

1 Public Posts - Mon Apr 08, 2019

1 Public Posts - Wed Apr 17, 2019

3 Public Posts - Thu Apr 18, 2019

2 Public Posts - Sat Apr 20, 2019

2 Public Posts - Mon Apr 22, 2019

3 Public Posts - Thu Apr 25, 2019

1 Public Posts - Fri Apr 26, 2019

3 Public Posts - Sat May 11, 2019

1 Public Posts - Sun May 12, 2019

2 Public Posts - Mon May 13, 2019

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Jun 4
Trains with ARP 15 Dep on: Sun Jun 9
Trains with ARP 30 Dep on: Mon Jun 24
Trains with ARP 120 Dep on: Sun Sep 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4246530
    Mar 02 2019 (12:59AM)


    @all: Regarding the new SCoR zone, our VSKP and other SCoR members are excited and interested to change the train/station zones. We may let them go ahead with it. This piece of info is NOT critical for trains and TTs which would affect regular passengers - so it's FINE. . We may let them...
  • Entry# 4239625
    Feb 22 2019 (10:22PM)


    @all: This is a repeat warning to all that: Anonymous posting may NOT be used to directly address regular members -> like scolding them, commenting about their blogging habits, arguing with them, or ANY other personal comment/remark against any other member, EVEN if it is not offensive. ANY personal remark (even if not...
  • Entry# 4214881
    Feb 01 2019 (07:45PM)


    This is an advance notice of the last and CORE feature of the RailFan app - Trips/Spottings - which will be enabled next week. A week after that, RailFan will go into Open Beta, whereby all members will be able to download the app without providing their email. . The Trip/Spotting feature of...
  • Entry# 4213057
    Jan 31 2019 (05:45AM)


    A few small enhancements will be made to the site in the coming days, regarding Member profiles. . 1. Hereafter, we shall require REAL permanent names of members. Members will have the option of reporting those whose name is fake or not real. An SW will be issued, whereupon the member will have...
  • Entry# 4205675
    Jan 23 2019 (08:11PM)


    This is an advance notice of a small enhancement to the Forum. Within a couple of days, we shall introduce "anonymous posting" for Blogs and Trips. With "anonymous posting", members will still be required to login to your account and abide by all Forum guidelines, but your name will be hidden...
  • Entry# 4200970
    Jan 18 2019 (10:12PM)


    @all: This is to formally announce the END of the RailCal app. Due to the information blockade, the app has lost its value, and has been rendered completely useless. We are unable to support RailCal anymore. Sorry to disappoint our users. . RailCal has already been taken off the Google PlayStore. So once...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy