Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  

Ranikhet Express - रेगिस्तान में हरियाली

Full Site Search
  Full Site Search  
 
Sun Jul 21 01:21:30 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Post BlogPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 4071837
Posted: Dec 05 2018 (20:20)

1 Responses
Last Response: Dec 05 2018 (20:38)
  
Info Update
0 Followers
17301 views
Dec 05 2018 (20:20)  

Iconic ब्रह्मपुत्र मेल LHB❤️ᏕᏬᎮᏋᏒᎷᏗᏁ🚩^~   12225 blog posts   23123 correct pred (74% accurate)
Entry# 4071837            Tags   Past Edits
What is SMART COACH ?
➡️The Modern Coach Factory, Raebareli has built a “Smart Coach,” which is currently stationed at the lHB platform and is equipped with the state-of-the-art sensors and a centralised computer to monitor the status of all sensors through a single window. The chairman of the Railway Board, Ashwani lohani, inspected the newly built “Smart Coach” at the Safdarjung Railway Station in the presence of Rajesh Agarwal, the general manger of the Modern Coach Factory, and Arun Arora, the principal chief mechanical engineer of the Northern Railway. lohani expressed his satisfaction on the newly turned out “Smart Coach”, built indigenously under the Make in India initiative. lohani said, “100 new such coaches are to be rolled out in the
...
more...
near future.”
The new coach has a vibration based self-power harvesting sensor on the axle box which will predict the defects on the bearings, wheel defects and hard spot (defects) on the track. This will enable the railways to plan their maintenance on the accurate need-basis and will also eliminate line failures. The coach is fit with Passenger Information and Coach Computing Unit (PICCU) which will monitor the four important areas of coach maintenance and passenger interface namely, the coach diagnostic system; security and surveillance system; interface with other sub-system like air conditioning, disc-brake system, fire detection and alarm system, water level indicator and the GPS based passenger announcement and passenger information system and the digital destination board.
The passenger information system will inform the passengers about the current location of the train and the next station along with the expected time of arrival at the next station. This system can also show the speed of the train.
The water level indicator can give advance information to the maintenance staff through an SMS about the requirement of refilling.
The coach also has CCTVs with artificial intelligence capability which will enhance the security of the passengers and also monitor the behavior and activities of the railway staff on board. The footage will also help in investigation into any untoward incident during the journey and in identifying the culprits and in direct intervention from remote control centre.
The AC temperature can be monitored on run from a remote location and adjustments can also be done if required. The coach is also provided with the emergency talk-back system for communication between the passengers (especially woman and children) and the guard of the train so that necessary assistance can be provided. Wi-Fi hot-spot information system has also been made available for the passengers.
An additional cost of all systems and equipment is expected to be approximately Rs 12-14 lakh, which can be recovered in a year or so. The system of “Smart Coach” will help in switching from preventive maintenance to predictive maintenance of coaches and tracks. With this initiative, the maintenance requirement is expected to come down, become cost-effective and targeted maintenance can be planned in advance.

  
16644 views
Dec 05 2018 (20:38)
Iconic ब्रह्मपुत्र मेल LHB❤️ᏕᏬᎮᏋᏒᎷᏗᏁ🚩^~   12225 blog posts   23123 correct pred (74% accurate)
Re# 4071837-1            Tags   Past Edits
Silent features
1. The SMART coach has a “vibration-based self power harvesting sensor” that is there on the axle box. This helps predict wheel defects, defects on the bearings, and hard spot (defects) on the track. What this means is that Indian Railways will now be able to plan maintenance as per need. This will also eliminate line failures.
2. SMART coach has a Passenger Information and Coach Computing Unit (PICCU) a CPU that is similar to an industrial grade computer. This has been provided with GSM network which sends ‘exception reports’ to
...
more...
the remote server. PICCU will monitor 4 important areas of coach maintenance and passenger interface.
A. Security and surveillance system: CCTV system with artificial intelligence capability will improve the security standards of the train and also help in keeping a check on the behaviour of the railway staff. The footage would help track untoward incidents.
B.GPS-based passenger announcement and passenger information system and the digital destination board: The passenger information system keeps passengers informed about the current location of the train, expected time of arrival at the next station and the speed of the train.
C. Coach diagnostic system: The SMART coach system can monitor the brake system and detect any default in it. This in turn can be communicated to the maintenance staff.
D. Interface with other sub-systems like air conditioning, fire detection and alarm system, disc brake system and water level indicator. The water level indicator would ensure that maintenance staff get advanced information through SMS about the need to refill water. The AC temperature will be monitored on the go from a remote location and any adjustment can be made for the comfort of the passengers.
According to Indian Railways with the SMART coach, the overall maintenance cost will come down since the sensor based system will provide advance notification about impending faults. Indian Railways claims that the cost of the system – approximately Rs 12-14 lakh will be recovered in a year’s time.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Jul 31
Trains with ARP 15 Dep on: Mon Aug 5
Trains with ARP 30 Dep on: Tue Aug 20
Trains with ARP 120 Dep on: Mon Nov 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4246530
    Mar 02 2019 (12:59AM)


    @all: Regarding the new SCoR zone, our VSKP and other SCoR members are excited and interested to change the train/station zones. We may let them go ahead with it. This piece of info is NOT critical for trains and TTs which would affect regular passengers - so it's FINE. . We may let them...
  • Entry# 4239625
    Feb 22 2019 (10:22PM)


    @all: This is a repeat warning to all that: Anonymous posting may NOT be used to directly address regular members -> like scolding them, commenting about their blogging habits, arguing with them, or ANY other personal comment/remark against any other member, EVEN if it is not offensive. ANY personal remark (even if not...
  • Entry# 4214881
    Feb 01 2019 (07:45PM)


    This is an advance notice of the last and CORE feature of the RailFan app - Trips/Spottings - which will be enabled next week. A week after that, RailFan will go into Open Beta, whereby all members will be able to download the app without providing their email. . The Trip/Spotting feature of...
  • Entry# 4213057
    Jan 31 2019 (05:45AM)


    A few small enhancements will be made to the site in the coming days, regarding Member profiles. . 1. Hereafter, we shall require REAL permanent names of members. Members will have the option of reporting those whose name is fake or not real. An SW will be issued, whereupon the member will have...
  • Entry# 4205675
    Jan 23 2019 (08:11PM)


    This is an advance notice of a small enhancement to the Forum. Within a couple of days, we shall introduce "anonymous posting" for Blogs and Trips. With "anonymous posting", members will still be required to login to your account and abide by all Forum guidelines, but your name will be hidden...
  • Entry# 4200970
    Jan 18 2019 (10:12PM)


    @all: This is to formally announce the END of the RailCal app. Due to the information blockade, the app has lost its value, and has been rendered completely useless. We are unable to support RailCal anymore. Sorry to disappoint our users. . RailCal has already been taken off the Google PlayStore. So once...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy