update of Ahmedabad - Mahesana #GC
1. old MG track at Sabarmati PF
2. electrification done at SBI
3-4. MG train
5.laying of sleeper for BG track
6-7....
more... Mahesana - taranga hill Old MG train (MG track are still seen)
8. BG sleeper laying Work in progress
9-12. Ground levelling going on (ARAVALI exp on A Deep curve )
13-14. BG track layed in Chandkhera rd - Khodiyar stretch
15. MG track removed ,but sleeper still remaining (post Kalol towards Mahesana)
16. electrification @ Kalol OHE are not High rise.
17. MG sleeper near Jhulasan , Pansar Station.
18-22.GL Near Dangarwa (Pre and post station)
23. scene near Dangarwa station
24-26 Old MG Bridge
25 BG track At Mahesana
27.MG sleeper near Jagudan station
28. Mahesana Station
ЁЯФ╣Electrification is done at high pace ; on the levelled Ground i.e. For new BG track which will be layed {Poles erection, Foundation Work , fixing of erected poles , Installation of stay tube and bracket tube is been done at intermediate location. }
ЁЯФ╕ Target of Commision in March 2019 of second BG Track from Ahmedabad - Kalol Can be acheived if same speed is maintained , or it will delayed till Dec 2019
#AhmedabadAjmerDoubling #AhmedabadDelhiElectrification