Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
Pic/Vid:   FmT Pic:   FmT Video:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    Topics:    

Search
  Go  
dark modesite support
 
Thu Apr 25 00:47:45 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search

Blog Entry# 1695794
Posted: Dec 30 2015 (04:12)

446 Responses
Last Response: Dec 31 2015 (18:16)
6 Followers
Race Blog
24493 views
12

★★
Dec 30 2015 (04:12)   22110X/Hazrat Nizamuddin - Mumbai LTT AC SF Express | NZM/Hazrat Nizamuddin (9 PFs)
 
AweskhanTraveler^~
AweskhanTraveler^~   56722 blog posts
Entry# 1695794            Tags   Past Edits
©®Δ©®Δ©®Δ©®Δ©®Δ©®Δ©®Δ©®Δ©®Δ©®Δ©®
:::::::::::::::::::::::::::::::: Date 30/12/2015 ::::::::::::::::::::::::::::::::::
♤●♤●♤ Last Race blog of 2015 ♤●♤●♤
::::::: मध्य रेल्वे :******: मध्य रेल :******: Central Railway ::::::
२२११० हजरत निजामुद्दीन - मुंबई लोकमान्य टिळक टर्मिनस वातानुकूलित एक्सप्रेस
२२११०
...
more...
हजरत निजामुद्दीन - मुंबई लोकमान्य टिळक टर्मिनस वातानुकूलित एक्सप्रेस
22110 Hazrat Nizamuddin - Mumbai LTT AC SF Express
©®Δ©®Δ©®Δ©®Δ©®Δ©®Δ©®Δ©®Δ©®Δ©®Δ®
☆ ☆ ☆ overtake list ☆ ☆ ☆
1. 22942 at OKHLA.
2. 64016 at TUGLAKABAD.
3. 12410 at CHATA.
4. 16032 at MATHURA.
5. 12780 at BHANDAI.
6. 14310 at BANMOR.
7. 12716 at RAYARU.
8. 51816 at SITHOULI
9. 18478 at LALITPUR.
10. 51828 at JAKHALAUN.
11. 14624 at AGASOD.
12. 11078 at HOSHANGABAD.
13. 18233 at ITARSI.
14. 51158 at KHANDWA.
15. 11094 at NIMBHORA.
16. 12118 at MANMAD.
17. 95412 at KASARA.
☆ ☆ ☆ Summary of 22110 NZM-LTT AC EXP on dated 30/12/2015 ☆ ☆ ☆
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
North Railway ♧♧♧ (2 OTs)
NZM 15:45 (On time)
PWL 16:40 (10min late)
49km in 55min = 53kmph (10min delay added )
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
North Central Railway♧♧♧(9 OTs)
PWL 16:40 (10min late)
BINA 22:27 (21min late)
507km in 5hrs 47min = 88kmph (11min delay added)
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
Western Central Railway♧♧♧ (2 OTs)
BINA 22:27 (21min late)
KNW 04:30 (50min late)
413 km in 6hrs 3min =68kmph (29min delay added )
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
Central Railway ♧ ♧ ♧ (4 OTs)
KNW 04:30 (50min late)
LTT 13:15 (75min late)
548km in 8hrs 45min =63kmph (25min delay added )
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
Overall performance ♧♧♧ (17 OTs)
NZM 15:45 (On time)
LTT 13:15 (75min late)
1518km in 22hrs 30min= 71kmph (75min late)
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
☆ ☆ ☆ Conclusion ☆ ☆ ☆
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
North Railway...
☆average run☆
● 10min delay added in NR due to lots of TSR/PSR.
● 5min delay can be cover if WAP-7 loco provided.
● MAS RAJDHANI took 50min for NZM-PWL section with WAP-7 loco and 22110 took 55min for same distance with WAP-4.
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
North Central Railway...
☆excellent run☆
● 11min delay added in NCR.
● AC took 21min for AGC - BHA 10km section where Rajdhani took only 13min,
● This delay can be cover if WAP-7 loco will provide for better acceleration and breaking power.
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
Western Central Railway....
☆Worst run☆
● 29min delay added in WCR due to extra halt at ET/BPL and slow run in BINA-BPL and BUDNI ghat section.
● 5min extra halt at BPL and 5min unschedule halt at ET, So total 10min lost.
● AC took 2hrs for covering BINA-BPL section due to lots of TSR (with WAP-4 loco) , on same route 22692 covered BINA-BPL section in 104min with WAP-7 loco.
● Same in BPL-ET ghat section, AC took 92min with WAP-4 loco where 22692 took only 79min with WAP-7 loco.
● If WAP-7 loco will provide then 22109 can save more than 30min.
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
Central Railway....
☆below average run☆
● 25min delay added in CR.
● NZM-LTT AC EXP should be cover atleast 20min delay in KNW-LTT section of CR because of last leg slack.
● Train lost more than 20min near Manmad Junction including 10min halt, reason: low priority.
● 22110 took 50min for covering IGP-KSRA ghat section, It shouldn't take more than 30min for covering same distance. WAP-7 locomotive with high breaking power will be the solution of this.
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°

Translate to English
Translate to Hindi

449 Posts

4494 views
1

Dec 31 2015 (17:36)
AweskhanTraveler^~
AweskhanTraveler^~   56722 blog posts
Re# 1695794-450              
North Central Railway...
☆excellent run☆
● 11min delay added in NCR.
● AC took 21min for AGC - BHA 10km section where Rajdhani took only 13min,
● This delay can be cover if WAP-7
...
more...
loco will provide for better acceleration and breaking power.

Translate to English
Translate to Hindi

4231 views
2

Dec 31 2015 (17:46)
AweskhanTraveler^~
AweskhanTraveler^~   56722 blog posts
Re# 1695794-451              
Western Central Railway....
☆Worst run☆
● 29min delay added in WCR due to extra halt at ET/BPL and slow run in BINA-BPL and BUDNI ghat section.
● 5min extra halt at BPL and 5min unschedule halt at ET, So total 10min lost.
...
more...
AC took 2hrs for covering BINA-BPL section due to lots of TSR (with WAP-4 loco) , on same route 22692 covered BINA-BPL section in 104min with WAP-7 loco.
● Same in BPL-ET ghat section, AC took 92min with WAP-4 loco where 22692 took only 79min with WAP-7 loco.
● If WAP-7 loco will provide then 22109 can save more than 30min.

Translate to English
Translate to Hindi

4244 views
1

Dec 31 2015 (17:59)
AweskhanTraveler^~
AweskhanTraveler^~   56722 blog posts
Re# 1695794-452              
Central Railway....
☆below average run☆
● 25min delay added in CR.
● NZM-LTT AC EXP should be cover atleast 20min delay in KNW-LTT section of CR because of last leg slack.
● Train lost more
...
more...
than 20min near Manmad Junction including 10min halt, reason: low priority.
● 22110 took 50min for covering IGP-KSRA ghat section, It shouldn't take more than 30min for covering same distance. WAP-7 locomotive with high breaking power will be the solution of this.

Translate to English
Translate to Hindi

4171 views
2

Dec 31 2015 (18:16)
AweskhanTraveler^~
AweskhanTraveler^~   56722 blog posts
Re# 1695794-453              
☆ ☆ ☆ Summary of 22110 NZM-LTT AC EXP on dated 30/12/2015 ☆ ☆ ☆
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
North Railway ♧♧♧ (2 OTs)
NZM 15:45 (On time)
PWL 16:40 (10min late)
49km
...
more...
in 55min = 53kmph (10min delay added )
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
North Central Railway♧♧♧(9 OTs)
PWL 16:40 (10min late)
BINA 22:27 (21min late)
507km in 5hrs 47min = 88kmph (11min delay added)
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
Western Central Railway♧♧♧ (2 OTs)
BINA 22:27 (21min late)
KNW 04:30 (50min late)
413 km in 6hrs 3min =68kmph (29min delay added )
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
Central Railway ♧ ♧ ♧ (4 OTs)
KNW 04:30 (50min late)
LTT 13:15 (75min late)
548km in 8hrs 45min =63kmph (25min delay added )
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
Overall performance ♧♧♧ (17 OTs)
NZM 15:45 (On time)
LTT 13:15 (75min late)
1518km in 22hrs 30min= 71kmph (75min late)
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°

Translate to English
Translate to Hindi

4295 views
4

Dec 31 2015 (18:16)
AweskhanTraveler^~
AweskhanTraveler^~   56722 blog posts
Re# 1695794-454              
☆ ☆ ☆ Conclusion ☆ ☆ ☆
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
North Railway...
☆average run☆
● 10min delay added in NR due to lots of TSR/PSR.
...
more...
5min delay can be cover if WAP-7 loco provided.
● MAS RAJDHANI took 50min for NZM-PWL section with WAP-7 loco and 22110 took 55min for same distance with WAP-4.
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
North Central Railway...
☆excellent run☆
● 11min delay added in NCR.
● AC took 21min for AGC - BHA 10km section where Rajdhani took only 13min,
● This delay can be cover if WAP-7 loco will provide for better acceleration and breaking power.
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
Western Central Railway....
☆Worst run☆
● 29min delay added in WCR due to extra halt at ET/BPL and slow run in BINA-BPL and BUDNI ghat section.
● 5min extra halt at BPL and 5min unschedule halt at ET, So total 10min lost.
● AC took 2hrs for covering BINA-BPL section due to lots of TSR (with WAP-4 loco) , on same route 22692 covered BINA-BPL section in 104min with WAP-7 loco.
● Same in BPL-ET ghat section, AC took 92min with WAP-4 loco where 22692 took only 79min with WAP-7 loco.
● If WAP-7 loco will provide then 22109 can save more than 30min.
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°
Central Railway....
☆below average run☆
● 25min delay added in CR.
● NZM-LTT AC EXP should be cover atleast 20min delay in KNW-LTT section of CR because of last leg slack.
● Train lost more than 20min near Manmad Junction including 10min halt, reason: low priority.
● 22110 took 50min for covering IGP-KSRA ghat section, It shouldn't take more than 30min for covering same distance. WAP-7 locomotive with high breaking power will be the solution of this.
°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°°° °°°°°°°°°°°°

Translate to English
Translate to Hindi

Travel SAFE

1. RailFanning does NOT MEAN dangerous pics/videos.
2. Doorplating pics/youtube videos are strictly FORBIDDEN in IRI.
3. Take plenty of food pics and other safe pics.
4. Write human interest narratives to make the pics interesting.
5. Enjoy blogging and travelling SAFELY.

REMEMBER: YOUR LIFE is the most precious thing, NOT RailFanning.

Rail News

New Trains

Site Announcements

  • Entry# 5648027
    Mar 01 2023 (12:44AM)


    In response to past confusions with Train/Station updates and resulting fights and controversies, the following clear and objective guidelines are being issued, with no room for any arguments or debates about validity. Also, included, some other changes with respect to Ratings. 1. All Red Ratings will require further explanation. Red Ratings won't...
  • Entry# 5388512
    Jun 24 2022 (08:45AM)


    As announced previously, there are a few changes coming to IRI user accounts, based on past practices. 1. As before, you will be able to quickly DELETE your IRI User account at ANY time. However, the menu option for this was hidden in the profile page, and could not easily be located....
  • Entry# 5148000
    Nov 29 2021 (06:40AM)


    A new feature will be released soon, whereby you can follow blogs tagged with specific Trains & Stations. If you have already posted blogs tagged with some Train/Station, then you will be set to automatically follow that Train/Station. Thereafter, any future news/blogs tagged with those Trains/Stations will be marked to your...
  • Entry# 5093784
    Oct 13 2021 (07:04AM)


    These days, every other day, we are getting requests from members to allow email login to their FB-based IRI account. 10 years ago, we had given the option for users to login through FaceBook - in retrospect, this was a mistake. These days, apparently, users are quitting FaceBook in droves because...
  • Entry# 4906979
    Mar 14 2021 (01:12AM)


    Followup to: Fmt Changes The new version of FmT 2.0 will soon be here - in about 2 weeks. As detailed in the previous announcement, many of the old FmT features like Train TT, Speedometer, Geo Location, etc. will be REMOVED. It will be a bare-bones simple app, focused on trip blogging. It...
  • Entry# 4898771
    Mar 06 2021 (10:33PM)


    There are some changes coming to FMT. Many of the features of FMT, like station arrival, TT, speed, geo, passing times, station time, etc. are ALREADY available in OTHER railway apps. So all of these features will be REMOVED. We'll have ONLY BLOGGING - quick upload of pics/videos/audio, etc. You may attach...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy