DHN and ADRA Div should try to built the proposed alternate rail link at the earliest........that will increase the speed of the trains somewhat....Ranchi is an almost lost cause.....It will probably never be upgraded to 130kmps because the those massive curves and gradient changes, but BKSC can be upgraded...