The whole track alignment is called a set, can be called a "Switch Set" or a "Trap Set". Trap set is similar to a derailing switch i have found it written as Trap Set/derailing switch in many places. Thats a single rail switched to lead out and make the train derail while the other rail has no switch arrangement.