Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark modesite support
 
Sat Jun 15 06:19:19 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz Feed
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
IMAGINARY Train. NOT an ACTUAL running Train.
(Imaginary Trains are created by RailFans to explore various alternative Train Routes and TTs. Such trains are NOT ACTUALLY RUNNING on the tracks.)

IMG15708-1270085/♥♥Amarpali Express ( Modified version)♥♥

ASR/Amritsar Junction --> KIR/Katihar Junction

Latest News
(You need to double-check/verify this info yourself)
News History
0 Follows
Pantry/Catering
✓ Pantry Car
✓ On-board Catering
✕ E-Catering
Practical - Can Easily be Introduced by IR
Introducing the modified version of Amarpali Express as of its need and huge demand of bihar passenger, it is daily running train with no PC thats...
more...
why adding PC, making it fast to get some punctuality etc, adding coaches due to all time demand train, making it as 24 coaches train with wap-7 till lko and after wdm-3a or wdp 4b/d. There is nothing better for this train after its introduce, as well as no one cares about it, this is daily running train and too much imp train mostly till ndls and itscnbitsng on time (hardly 30-40 minutes delay, thats why its very special and important train....
IMAGINARY Train.
TouristerDivyanshu^~
Updated:
Dep:
Arr:
RSA - Rake Sharing
This train has 5 rakes in all, and has on-board cleaning system available.
11
ICF Rake

Rake/Coach Position

  0
  L
  1
SLR
  2
 GN
  3
 GN
  4
 GN
  5
S11
  6
S10
  7
 S9
  8
 S8
  9
 S7
 10
 S6
 11
 S5
 12
 S4
 13
 S3
 14
 S2
 15
 S1
 16
 PC
 17
 B3
 18
 B2
 19
AB1
 20
 A1
 21
 GN
 22
 GN
 23
 GN
 24
SLR
News
PNR
Forum
Time-Table
Availability
Fare Chart
Map
Arr/Dep History
Trips
Gallery
ΣChains
X/O
Timeline
Train Pics
Tips

Train Forum

Page#    1 blog entries  
Imaginary
5773 views
11

Oct 27 2015 (16:59)   IMG15708-1270085/♥♥Amarpali Express ( Modified version)♥♥
 
TouristerDivyanshu^~
TouristerDivyanshu^~   578 img trains   330 popular
3986 net green flags   8 green per Train
Entry# 1630324            Tags  
Custom Ratings
/train/37407
Rate this modified version of Amarpali Express train, speeded up and remove 3 halts, add AC and SL coaches with PC and its humble request plz give reason for red flag otherwise plz don't rate if not want to give reason, thankyou
Translate to English
Translate to Hindi

5 Posts

3516 views
1

Oct 27 2015 (22:56)
12301_KOLKATA_RAJDHA^~
12301_KOLKATA_RAJDHA^~   3655 blog posts
Re# 1630324-6              
Good one
Translate to English
Translate to Hindi

3409 views
0

Oct 27 2015 (23:14)
TouristerDivyanshu^~
TouristerDivyanshu^~   173443 blog posts
Re# 1630324-7              
thanks a lot sir :)
rate this one too sir, modified version of shaheed express
/blog/post/1630617
Translate to English
Translate to Hindi

2411 views
1

Oct 28 2015 (18:40)
Praveen~
Praveen~   5723 blog posts
Re# 1630324-8              
KLD-DMG only 33km electrification hi baki hai maybe end of year pora ho jayega................ LKO-BJU fully electrified
Translate to English
Translate to Hindi

2359 views
1

Oct 28 2015 (18:46)
TouristerDivyanshu^~
TouristerDivyanshu^~   173443 blog posts
Re# 1630324-9              
hmmm
IRI is showing that from GD to GKP electrification is under construction, thats why i am not updating this img train but despite it, this train is really needed changes as of demand
Translate to English
Translate to Hindi

2312 views
0

Oct 28 2015 (19:14)
TouristerDivyanshu^~
TouristerDivyanshu^~   173443 blog posts
Re# 1630324-10              
rate for modified version
Translate to English
Translate to Hindi
Page#    1 blog entries  

Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy