Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Topic
 #
 Rating
 Correct
 Wrong
 Stamp
 PNR Ref
 PNR Req
 Blank PNRs
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Search Trains
 ↓ 
×
DOJ:
Dep:
SunMonTueWedThuFriSat
Class:
2SSLCCEx3AFC2A1A3EEAVSEV
Type:
 

Train Details
Words:
LHB/ICF:
Pantry:
In-Coach Catering/Pantry Car
Loco:
Reversal:
Rake Reversal at Any Stn
Rake:
RSA:
With RSA
Inaug:
 to 
# Halts: to 
Trvl Time: to  (in hrs)
Distance: to  (in kms)
Speed: to  (in km/h)

Departure Details
Include nearby Stations:      ONLY this Station:
Dep Between:    
Dep PF#:
Reversal:
Rake Reversal at Dep Stn

Arrival Details
Include nearby Stations:      ONLY this Station:
Arr Days:
SunMonTueWedThuFriSat
Arr Between:    
Arr PF#:
Reversal:
Rake Reversal at Arr Stn

Search
  Go  
dark mode
 
Thu Mar 28 14:46:59 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Quiz
Topics
Gallery
News
FAQ
Trips
Login
Post PNRPost BlogAdvanced Search
What is the Electrification progress along the BSB-SLN-LKO route?  
32 Answers
Jan 26 2012 (11:49)
General

Entry# 980     
JudgeSahab^~
What is the Electrification progress along the BSB-SLN-LKO route?

★★★  Rail Fanning
57495 views
68
Jan 28 2013 (23:05)
Blog Post# 654925-0     
JudgeSahab^~   Added by: JudgeSahab^~  Feb 16 2013 (17:36)
First Electric ALIVE WAG Loco Spotted at Maharani Pachim Varanasi-Lucknow newly electrified strech
++++++++++++++++++++++++++
THIS was the first catch of electric loco at Maaharani Paschim a small station at BSB-LKO strech.Capturted by me while travelling on Shramjeevi Superfast Express 12391
this loco seems to be WAG 7
++++++++++++++++++++++++++
...
more...

Speed of Shramjeevi is very high passseed in seceonds

★  
16558 views
8
Feb 20 2012 (00:03)
Blog Post# 353582-0     
Arifwap   Added by: JudgeSahab^~  Feb 20 2012 (03:44)
rare video of DRM spl train at sln jn ,, drm comes sln for seeing progress of electrification work
video shot by me

19507 views
5
Dec 29 2011 (01:02)
Blog Post# 314287-13     
Arifwap   Added by: JudgeSahab^~  Jan 26 2012 (11:49)
this train[and sum other] comes sln jn for electrification

18885 views
1
Jan 05 2012 (22:55)
Blog Post# 314287-23     
Arifwap   Added by: JudgeSahab^~  Jan 26 2012 (11:51)
ya ,, i think is year me last tak start ho jayege ,,

18688 views
4
Jan 05 2012 (23:57)
Blog Post# 314287-27     
JudgeSahab^~   Added by: JudgeSahab^~  Jan 26 2012 (11:52)
haan yeh gud news hai
bandhua se aagey tak wiring ka bhi kaam pura ho chuka hai
station pe bhi jaldi hi pura ho jayega
BSB ki taraf kaam slow ho gya the beech me qki cement ki bori chori ho ja rahi thi
par
...
more...
ab sab theek chal raha hai

★  
18921 views
7
Jan 09 2012 (23:58)
Blog Post# 314287-30     
JudgeSahab^~   Added by: JudgeSahab^~  Jan 26 2012 (11:53)
one more

19056 views
3
Jan 12 2012 (21:44)
Blog Post# 314287-115     
Arifwap   Added by: JudgeSahab^~  Jan 26 2012 (11:55)
sir i think OHE Inspection Van is here for wiring near sln jn ,, as the Electrical wiring work starts frm last 2-3week near sln jn

★  
18882 views
8
Jan 12 2012 (22:29)
Blog Post# 314287-117     
JudgeSahab^~   Added by: JudgeSahab^~  Jan 26 2012 (11:56)
latest snap of electrification
how is this

★  
18556 views
8
Jan 12 2012 (22:32)
Blog Post# 314287-119     
JudgeSahab^~   Added by: JudgeSahab^~  Jan 26 2012 (11:57)
one more

★  
18702 views
7
Jan 12 2012 (23:31)
Blog Post# 314287-123     
JudgeSahab^~   Added by: JudgeSahab^~  Jan 26 2012 (11:58)
one clip showing the same
taken today

★  
18659 views
9
Jan 16 2012 (00:40)
Blog Post# 314287-153     
JudgeSahab^~   Added by: JudgeSahab^~  Jan 26 2012 (11:59)
@SLN
Subah 6 bje ye haal hai yeh mujhe varanasi jana tha himmat jawab de di

18363 views
4
Jan 25 2012 (22:47)
Blog Post# 314287-174     
Arifwap   Added by: JudgeSahab^~  Jan 26 2012 (12:00)
now u can see electric poles poles at sln jn. work going on really fast

18647 views
4
Jan 25 2012 (22:50)
Blog Post# 314287-175     
Arifwap   Added by: JudgeSahab^~  Jan 26 2012 (12:00)
more pic

19067 views
4
Jan 25 2012 (22:53)
Blog Post# 314287-177     
Arifwap   Added by: JudgeSahab^~  Jan 26 2012 (12:01)
RU VAN

18606 views
4
Jan 25 2012 (23:01)
Blog Post# 314287-179     
Arifwap   Added by: JudgeSahab^~  Jan 26 2012 (12:01)
from ground

★  
18721 views
8
Jan 25 2012 (23:41)
Blog Post# 314287-184     
rangcharylutk~   Added by: JudgeSahab^~  Jan 26 2012 (12:02)
RLY ELECtRIFICATION job is very though job and takes some time due to traffic,the phases involved
1.survey,2,drawing and plans,3,printing of drawing and taking approval (which includes future development of stations,yards etc,4.material ordering,5,pit preparation,concreting,erection of poles,grouting,fixing fixtures to poles inspection of insulators to replace any cracked ones,construction of substations wiring charging (tosafe guard copper from theft) test run and finally allowing to commercial use....

18083 views
4
Jan 27 2012 (23:04)
Blog Post# 314287-197     
Arifwap   Added by: JudgeSahab^~  Jan 28 2012 (01:55)
little video about sln jn electrification work
video taken by me

★  
17384 views
9
Jan 28 2012 (02:44)
Blog Post# 314287-199     
JudgeSahab^~   Added by: JudgeSahab^~  Jan 30 2012 (23:22)
kindly see the behind view of the electric pole
wire streching is still pending
a shot of lambhua station (SLN-BSB route)
also can see the single track

★  
17454 views
10
Jan 28 2012 (02:52)
Blog Post# 314287-200     
JudgeSahab^~   Added by: JudgeSahab^~  Jan 30 2012 (23:22)
can see the work in progress :)
todays snap

★  
17376 views
8
Jan 28 2012 (03:53)
Blog Post# 314287-201     
JudgeSahab^~   Added by: JudgeSahab^~  Jan 30 2012 (23:22)
night view :)

★  
17127 views
7
Jan 28 2012 (03:55)
Blog Post# 314287-202     
JudgeSahab^~   Added by: JudgeSahab^~  Jan 30 2012 (23:24)
workers working their best

★  
17311 views
9
Jan 28 2012 (03:58)
Blog Post# 314287-204     
JudgeSahab^~   Added by: JudgeSahab^~  Jan 30 2012 (23:24)
old signals present @SLN

★  
17276 views
7
Jan 28 2012 (04:02)
Blog Post# 314287-206     
JudgeSahab^~   Added by: JudgeSahab^~  Jan 30 2012 (23:26)
new electronic signals are ready to take its new place

★  
17195 views
7
Jan 28 2012 (04:04)
Blog Post# 314287-207     
JudgeSahab^~   Added by: JudgeSahab^~  Jan 30 2012 (23:27)
one more

★  
17198 views
8
Jan 28 2012 (04:05)
Blog Post# 314287-208     
JudgeSahab^~   Added by: JudgeSahab^~  Jan 30 2012 (23:28)
our station board

★  
17392 views
8
Jan 28 2012 (04:09)
Blog Post# 314287-210     
JudgeSahab^~   Added by: JudgeSahab^~  Jan 30 2012 (23:28)
can see the poles erected beside the station

★  
17703 views
8
Jan 28 2012 (04:10)
Blog Post# 314287-211     
JudgeSahab^~   Added by: JudgeSahab^~  Jan 30 2012 (23:29)
here u can also see some poles

★  
17477 views
7
Jan 28 2012 (04:13)
Blog Post# 314287-213     
JudgeSahab^~   Added by: JudgeSahab^~  Jan 30 2012 (23:29)
the space maintained to erect the poles

17475 views
4
Jan 28 2012 (12:48)
Blog Post# 314287-216     
rangcharylutk~   Added by: JudgeSahab^~  Jan 30 2012 (23:30)
yes i hv seen,,both veidio and your photo with poles, after poles lot of work left,wiring,most erection,earthing,jointing rails or putting spring wires as joints (rails are earthing points) adjusting,seperate wiring for return conductors to avoid distrubance to telephone signals,fixing cautoion boards,fixing counterweights depending upon the weather etc..of work left

★  
15164 views
7
Jan 31 2012 (02:22)
Blog Post# 314287-227     
JudgeSahab^~   Added by: JudgeSahab^~  Feb 20 2012 (03:47)
how is this ??
my new creation :)

14982 views
4
Feb 04 2012 (22:44)
Blog Post# 314287-232     
Arifwap   Added by: JudgeSahab^~  Feb 20 2012 (03:47)
little video about sln jn electrification work [part2]
video taken by me

★  
14737 views
6
Feb 19 2012 (23:54)
Blog Post# 314287-257     
Arifwap   Added by: JudgeSahab^~  Feb 20 2012 (03:48)
electrification work is nearly completed
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy